My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00255 In-ground Pool
Orono
>
Property Files
>
Street Address
>
M
>
McCulley Road
>
525 McCulley Road - 31-118-23-24-0012
>
Permits/Inspections
>
2013-00255 In-ground Pool
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:30:28 PM
Creation date
7/13/2017 10:14:43 AM
Metadata
Fields
Template:
x Address Old
House Number
525
Street Name
McCulley
Street Type
Road
Address
525 McCulley Road
Document Type
Permits/Inspections
PIN
3111823240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . �-O�o <br /> C ITY OF ORONO <br /> �, �, Street Address: Mailing Address: Telephone(952)249-4600 <br /> y�, ti 2750 Kelley Parkway P.O. Box bb Fax (952)249-4616 <br /> l,y F,�' Orono,MN 55356 Crystal Bay, MN 55323 www.ci.orono.mn.us <br /> KE S H�� <br /> April 30, 2013 <br /> Pat Henry <br /> Prestige Pools <br /> 87 County Road E West <br /> St. Paul, MN 55117 <br /> Re: 525 McCulley Road <br /> Building Permit Application #2013-00255 <br /> On April 17, 2013 the City received a building permit application for a pool. Your application is <br /> incomplete. <br /> The following items must be submitted or revised in order for your application to be considered <br /> complete and for the plan review to continue: <br /> 1. Certificate of Survey. A survey was submitted with the application. Our City engineer has <br /> reviewed the survey, his comments are attached. Please provide 2 copies of an updated, full <br /> size certificate of survey which meets all of the City's survey standards (enclosed) indicating the <br /> location of the proposed pool, including existing and proposed grading as well as all existing <br /> buildings, structures, landscaping and retaining walls on the property. <br /> �' Building Permit Application for a Swimming Pool. The property owner's signature is <br /> required on the building permit application prior to the issuance of the pool permit. <br /> 3. Wetland Delineation. According to the City's wetland map, two wetlands are present. One <br /> wetland is classified as a Manage 2 wetland. According to Orono's City Code Chapter 78 <br /> Article XI Wetlands Protection, Manage 2 wetlands require a 25 foot wide vegetative buffer. <br /> Also, the map indicates an "unclassified" wetland may exist on the property. Additional <br /> information may need to be submitted to the MCWD and the City to determine buffer width. <br /> Contact the MCWD to determine if it is necessary to hire a wetland delineator to perform a MN <br /> Ram analysis and complete a functional assessment to determine the preservation classification <br /> (i.e. buffer width) of the unclassified wetland. Please submit a wetland delineation report to the <br /> Minnehaha Creek Watershed District (MCWD) for their approval. The approved delineated <br /> edge of the wetland(s) must be shown on the survey including the required buffer width and <br /> structure setback of 20 feet. <br /> 4. Wetland Buffer(s). The proposed project appears to trigger the administration of the City's <br /> Wetlands Protection regulations. Once the delineated edge of the wetland and the required <br /> buffer has been marked in the field by the surveyor, our wetland specialist will visit the site. The <br /> wetland specialist will determine if the existing wetland buffer meets with City Code Section 78- <br /> 1605 or if a buffer must be established. A report will be generated stating if the buffer meets city <br /> code or if invasive species must be removed and native vegetation planted. The wetland <br /> specialist report will also contain an escrow amount, which must be received prior to the <br /> swimming pool permit being issued. The wetland buffer escrow will ensure the wetland buffer <br /> improvements or establishment are completed. You will be required to submit a planting plan <br /> for the wetland specialist to approve. <br />
The URL can be used to link to this page
Your browser does not support the video tag.