My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-P08059 - demo
Orono
>
Property Files
>
Street Address
>
M
>
Mapleridge Lane
>
2665 Mapleridge Lane - 21-117-23-21-0004
>
Permits/Inspections
>
2004-P08059 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:02:05 PM
Creation date
7/12/2017 2:55:01 PM
Metadata
Fields
Template:
x Address Old
House Number
2665
Street Name
Mapleridge
Street Type
Lane
Address
2665 Mapleridge Lane
Document Type
Permits/Inspections
PIN
2111723210004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.� <br /> _t <br /> 7. Within 5 working days of superstructure removal,a final inspection shall be requested. The <br /> site shall be left clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation(except when such excavation is to be used as part of a new <br /> building aizd such new building is actually under construction). <br /> 8. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses,includiilg attorney fees, against the City,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> 9. Septic systems rnust be abandoned per Minnesota Rules Chapter 7080. All septic tanlcs must <br /> be pumped,crushed and filled with native soils. An inspection is required after the tai�lcs are <br /> pumped and before the tai�lcs are crushed and filled. <br /> PERMIT TYPE AND FEE CALCULATION <br /> � $50.00 - Principal Structure <br /> � $30.00 -Accessory Structure <br /> L Subtotal of above permit requested $ �� � � � <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 aUove) $ �� � S � <br /> The undersigned hereby applies to the City of Orono for issuance of a Demolition Permit, agrees to <br /> do all worlc in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are complete,true and correct. <br /> APPLICANT'S SIGNATURE: �-�s Date: �d - 7 " ° `r <br /> OWNER'S SIGNATURE: ����- Date: ���� �°Y <br /> APPROVED BY: � Date: 10 •I N- o�{ <br /> �-� <br />
The URL can be used to link to this page
Your browser does not support the video tag.