Laserfiche WebLink
CITY OF ORONO � APPLICATION FOR UTILITY PERMITS <br /> Box 66 (2750 Kelley Parkway) _ SEWER/WATER <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for utility permits by mail or in person at the City offices. <br /> 2. Mailed in applications are subject to the postage and handling fees shown below. Permit cards will be sent <br /> by retum mail the same day the application is :eceived. <br /> 3. Permits are not valid until you receive a per�it card. <br /> 4. Work must not begin unless the permit card is available on the job site. <br /> 5, Utility connection permits may be issued to licensed contractors only. <br /> 6. Contact the Public Works Department (473-7357)for utility stub as-built locations. DO NOT EXCAVATE <br /> IN ANY STREET AND DO NOT TAP ANY MAIN without express approval of the Public Works <br /> Department. Issuance of a permit does not grant this approval. <br /> 7. All work must be done in accordance with State Code requirements. <br /> 8. All work must be inspected before it is covered. Call 473-7357. <br /> 24 hour notice required. <br /> � <br /> JOB STTE ADDRFSS: Z�Co � ��! -� �% ���7 � 2..�..� <br /> Occupancy Type: Residential Commercial <br /> Owner's Na.-ne: (� � r , I;,� 5 ,�,,�,�,�; Phone Number: `� � t - a 3 <: �t <br /> Mailing Address: s r�M� � z ������ City: l.,y � >>� 7�: <br /> Contractor's Name: t�� � � �c>> � Phone Number: �t��- �'�% � <br /> Mailing Address: �-� � ;� fi' rr ; City: ���,r�� �_ �P� <br /> PERMIT TYPE <br /> Municipal Sewer Connection ($35.00 per stub) $ <br /> pipe size inches; material PVC (on sand fill); cast iron <br /> SAC Charge ($750.00) must accompany all sewer permit applications unless prepaid. If not <br /> prepaid, a sewer connection permit will not be issued. <br /> Municipal Water Connection ($35.00 per stub) $ <br /> pipe size inches; material copper; other <br /> VVATER METERS must be picked up and paid for at City Hall. <br /> (5/8" meters = $133.00; 3/4" meters = $181.00; 1" meters = $235.00) <br /> Separate Plumbing Permit issued for water meter. <br /> Water meters must be set and sealed by Orono Water Department (473-735� upon <br /> completion of ineter installation. <br /> REQUIRED minimum setbacks from drainf'ield and septic tanks = 75' <br /> REQUIRED setback from sewer line = 20' <br /> PERMIT FEE CALCULATION <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surchar�e $ .50 <br /> The State Building Code Division Surcharge of$.50 per permit must be <br /> included for each well, sewer and water connection permit requested. <br /> 3. Posta�e & Handlin� (Only mail-in applications) $ 1.50 <br /> 4. TOTAL PERMIT FEE (add lines 1-3 above) $ <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to <br /> do all work in strict accordance with the ordinances of the City and the regulations of the State <br /> of Minnesota, and certifies that all statements made on this application are complete, true and <br /> correct. ��` <br /> ._ !t' ��'►� x" ,P...� r�/ <br /> Signature of Applicant. �� '`�"�� � <br />