Laserfiche WebLink
� . <br /> Inspection/Analvsis/Monitorins� Fees <br /> A site inspection and monitoring by District staff will be performed where the <br /> activity involves: <br /> • a commercial/industrial/multi-family residential development <br /> • a single family residential development greater than 5 acres or of any size if <br /> within the Minnehaha Creek subwatershed ' <br /> • any alteration of a floodplain or wetland � <br /> • dredging within the beds, banks or shores of any protected water or wetland i <br /> • a violation � <br /> • any project which in the judgment of the District staff should be inspected due � <br /> to project location, scope, or construction techniques I <br /> in these cases, the applicant shall pay to the District a fee equal to the actual <br /> costs of field inspeetion of the work, including investigation of the area affected <br /> by the work, analysis of the work, and any subsequent monitoring of the work, <br /> which in the case of a violation shall be at least$35. <br /> � <br /> � <br /> Standard Fee Schedule � <br /> � <br /> i <br /> District professional staff $ 57.74" � <br /> . District interns $ 36.44* i <br /> District clerical staff $ 42.16* I <br /> Consulting Senior Engineer $contracted rate , <br /> Consulting Engineer/Technician $contracted rate � <br /> District Counsel $contracted rate I <br /> Application fee $ 10.00 j <br /> Copy costs $ .25 + actual staff time � <br /> Color copy costs $ 1.00+actual staff time ' <br /> I <br /> " Hourly ' <br />