My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: elevations, etc.
Orono
>
Property Files
>
Street Address
>
M
>
Maple Place
>
1587 Maple Place - 08-117-23-33-0034
>
Correspondence
>
Re: elevations, etc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:44:59 PM
Creation date
7/12/2017 8:55:52 AM
Metadata
Fields
Template:
x Address Old
House Number
1587
Street Name
Maple
Street Type
Place
Address
1587 Maple Pl
Document Type
Correspondence
PIN
0811723330034
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t Melanle Curtis <br /> From: Melanie Curtis <br /> Sent: Wednesday, June 27, 2012 2:41 PM <br /> To: 'toddholmers@gmail.com' <br /> Cc: Christine Mattson; Mike Gaffron; 'djohnson@deanjohnsonhomes.com' <br /> Subject: permit 2012-00435 <br /> Attachments: admin@ci.orono.mn.us_20120627_135200.pdf <br /> Todd <br /> Mike Gaffron is out until Monday. Please see the attached, colored version of the submitted survey. In an effort to move <br /> this permit along I have reviewed the survey dated 06/15/12 submitted on June 18. It appears with the revised survev the <br /> home remains 3 stories and therefore is too tall. The red line reflects the current basement calculation and is short of the <br /> 50% requirement. <br /> There may be additional options for compliance but there are two solutions I see at this point that would not require <br /> significant changes to the home plans. I extrapolated contour lines to determine where the additional elevations might cut <br /> through the home—shown in pink and blue. My options are as follows: <br /> 1. Lower the first floor elevation by one foot to 945.6' leaving the basement floor elevation at 936.6' as proposed. <br /> The green perimeter line on the attached survey shows this accomplishes the percentage requirement from the <br /> first floor based on existing grade so your basement will qualify as a "basemenY' according to our code, or <br /> 2. Leave all floor elevations as they are and excavate living space under the attached garage so the garage <br /> perimeter may be included in the calculation. <br /> Please submit either new building plans or a revised survey to conform to the number of stories requirement in our Code. <br /> If you have questions please call or email Christine or myself in Mike's absence. <br /> Thanks, Melanie ?��� (� <br /> � �v �!�' � �� �n�� <br /> ��,� i`�" � � ��3�. �, <br /> Melanie Curtis "�►�^- �� G��✓E� <br /> Planning &Zoning Coordinator � � <br /> City of Orono � G�C���� <br /> 2750 Kelley Parkway ��r �(�t7✓ <br /> Orono, MN 55356 _ <br /> Direct Dial: 952.249.4627 "�� � �i��( � �'� <br /> Fax: 952.249.4616 �� �� <br /> Planning&2oning Office 952.249.4620 � G1� <br /> Email: mcurtisCa�ci.orono.mn.us / /J„� <br /> Website: www.ci.orono.mn.us /"� <br /> City of Orono SUMMER Office Hours <br /> Monday - Thursday 7:30 am to 5:00 pm <br /> Friday 7:30 am to 11:30 am <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.