Laserfiche WebLink
We recommend a bottom inspection be performed for the rest of the residence before fill sand is to <br /> be placed. During placement of the fill, we recommend being cailed back out for density testing. <br /> The fill should be placed in loose lifts of 12" or less, exercising caution near the saturated soil, to <br /> avoid pumping of the subgrade. <br /> Sincerely, <br /> ITCO Allied Engineering Company Reviewed By: <br /> , -�,i-�C�'�`�=_ ��c�,� � <br /> Joe Carlson, E.I.T. Robert P. Sullentrop, P.E. <br /> Inspector Minnesota Reg. # 17823 <br /> CC: City of Orono Building Inspections <br /> 701 - 1 / #605-2 /#606-0.5/#610—'/4 /#304-0/ #612- 110 <br />