My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P03683 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
L
>
Lyric Avenue
>
3551 Lyric Avenue - 17-117-23-43-0104
>
Permits/Inspections
>
2001-P03683 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:42:43 PM
Creation date
7/5/2017 10:14:54 AM
Metadata
Fields
Template:
x Address Old
House Number
3551
Street Name
Lyric
Street Type
Avenue
Address
3551 Lyric Avenue
Document Type
Permits/Inspections
PIN
1711723430104
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' Lindstrom Cleaning & Construction, Inc. <br /> 9621 TENTH AVENUE NORTH,PLYMOUTH,MN 55441-5098 <br /> Phone(763)544-8761 Fax(763) 544-8766 <br /> MN LIC#0001087 <br /> CONTINUED- Hall & Stairs <br /> DESCRIPTION QNTY UNIT COST TOTAL <br /> Remove&Replace 1/2"drywall-hung,taped,floated,ready for 444.00 SF 1.79 794.76 <br /> paint <br /> Remove&Replace 5/8"drywall-hung,taped,floated,ready for 54.13 SF 1.92 103.93 <br /> paint <br /> Acousric ceiling(popcorn)texture 54.13 SF 0.75 40.60 <br /> Remove&Replace Ceiling fan&light-High grade 1.00 EA Electrical <br /> SeaUprime the walls and ceiling 498.13 SF 037 184.31 <br /> Paint the walls 444.00 SF 0.43 190.92 <br /> Remove&Replace Baseboard-2 3/4" 55.50 LF 2.15 119.33 <br /> Finish baseboard 55.50 LF 0.62 34.41 <br /> Remove&Replace Balustrade 8.00 LF 219.98 1,759.84 <br /> Stain&finish balustrade 8.00 LF 12.65 101.20 <br /> Seal stair treads&risers for odor 7.00 EA 8.73 61.11 <br /> Remove&Replace Attic entrance cover and trim 1.00 EA 67.63 67.63 <br /> Remove&Replace Casing 67.00 LF 2.51 168.17 <br /> Finish door(per side) 4.00 EA 25.74 102.96 <br /> Finish casing 67.00 LF 0.66 44.22 <br /> Seal attic framing for odor control 12.00 SF 0.45 5.40 <br /> Remove Carpet-(material and labor) 125.24 SF 0.18 22.54 <br /> Carpet-(material and labor)+ 125.24 SF 3.03 379.48 <br /> Carpet pad 125.24 SF 0.49 61.37 <br /> Room: Bathroom LxWxH 5'0" x 2'10" x 8'0" <br /> Subroom 1: Toilet Offset LxWxH 2'll" x 2'2" x 8'0" <br /> Subroom 2: Shower Offset LxWxH 2'll" x 2'2" x 8'0" <br /> DESCRIPTION QNTY UNIT COST TOTAL <br /> Anita Harrison 04/06/2001 Page: 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.