Laserfiche WebLink
- . i . <br /> 9. <br /> �:� <br /> 1 a condition, but in order to get a building perr�it , <br /> 2 an application must be made two weeks in adv�nce ; <br /> 3 Mr. Henke has to submit two sets of plans and an energy <br /> 4 calculation form to insure compliance with the State <br /> 5 Energy Code ; there has to be a hard cover calculation <br /> 6 ' done and a survey with the addition drawn an� submitted <br /> 7 and a permit application which will be reviewed by <br /> 8 the Zoning and Building Department . That is just the <br /> 9 steps that he has to take to get the permit . <br /> IO Secondly, aZ1 rough grading will <br /> 11 be done by August Ist, 1°89 . <br /> 12 Tnird, if there is no permit by <br /> - �., �. <br /> 13 July lst, 1989, he wi1l be required to replace the <br /> .:... _ , ::� <br /> 14 siding on the north rear �:all by August� 15 , 1989.� <br /> .�.�-_ _ .=� , <br /> 15 Fourth, he will either put a safety <br /> ,,,,�....¢,....�:_...�_ . <br /> 16 bar on the east door or a conforming stairway on an <br /> .,►-�'.� <br /> 17 east door. � <br /> �'_ <br /> 18 Fi�th, he will attach a lid and lo�k � <br /> � <br /> 19 shut �he we11 by rebruary 24th or sooner if possible. <br /> 20 And then, finally, with the permit <br /> 21 applicatian, he wi11 subnit a construction schedule, <br /> 22 and the city has agreed that it would be acceptable <br /> 23 to have the construction, be that the basement, the <br /> 24 garage slab, the framing and sheathino and roof be <br /> 25 done by September 30, 1989 and that June lst , 1990 for <br />��:�, <br />:Fv 3 <br />