My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
paperwork re: code violations-inspections;ltrs;court papers, etc.
Orono
>
Property Files
>
Street Address
>
L
>
Lyric Avenue
>
3536 Lyric Avenue - 17-117-23-43-0056
>
Misc
>
paperwork re: code violations-inspections;ltrs;court papers, etc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:42:16 PM
Creation date
7/5/2017 9:08:17 AM
Metadata
Fields
Template:
x Address Old
House Number
3536
Street Name
Lyric
Street Type
Avenue
Address
3536 Lyric Avenue
Document Type
Misc
PIN
1711723430056
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- . i . <br /> 9. <br /> �:� <br /> 1 a condition, but in order to get a building perr�it , <br /> 2 an application must be made two weeks in adv�nce ; <br /> 3 Mr. Henke has to submit two sets of plans and an energy <br /> 4 calculation form to insure compliance with the State <br /> 5 Energy Code ; there has to be a hard cover calculation <br /> 6 ' done and a survey with the addition drawn an� submitted <br /> 7 and a permit application which will be reviewed by <br /> 8 the Zoning and Building Department . That is just the <br /> 9 steps that he has to take to get the permit . <br /> IO Secondly, aZ1 rough grading will <br /> 11 be done by August Ist, 1°89 . <br /> 12 Tnird, if there is no permit by <br /> - �., �. <br /> 13 July lst, 1989, he wi1l be required to replace the <br /> .:... _ , ::� <br /> 14 siding on the north rear �:all by August� 15 , 1989.� <br /> .�.�-_ _ .=� , <br /> 15 Fourth, he will either put a safety <br /> ,,,,�....¢,....�:_...�_ . <br /> 16 bar on the east door or a conforming stairway on an <br /> .,►-�'.� <br /> 17 east door. � <br /> �'_ <br /> 18 Fi�th, he will attach a lid and lo�k � <br /> � <br /> 19 shut �he we11 by rebruary 24th or sooner if possible. <br /> 20 And then, finally, with the permit <br /> 21 applicatian, he wi11 subnit a construction schedule, <br /> 22 and the city has agreed that it would be acceptable <br /> 23 to have the construction, be that the basement, the <br /> 24 garage slab, the framing and sheathino and roof be <br /> 25 done by September 30, 1989 and that June lst , 1990 for <br />��:�, <br />:Fv 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.