Laserfiche WebLink
� � ���v�� <br /> CITY OF ORONO� APPLICATION FOR MECHA1vICAL PERMIT <br /> Box 66 (2 i 50 Kelley Parkway) 3 �1 � <br /> Crystal Bay, MN 55323 ��C <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical Designs - Complete calculations, details and specifications are required for each heating, <br /> ventilation,humidification-dehumiditication, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on fiorm provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357. <br /> Please check one: New Addition Repair � Replace <br /> Residential Commercial <br /> Zip: -n <br /> JOB SI1'E:�S�� L�� `n x. �, <br /> Owner's N.:�e: '� � Telephone Number: �� -:'����s��`� <br /> Mailing Address: .,�, .,�i��.: � City: �i ,.,�.,,--�, Zip ���cr; <br /> �,rr? i r z. <br /> Contractor'sName: .-'"�`Yt ��-r���= _ TelephoneNumber: ' 'r ��'`�r�_ <br /> MailingAddress: ��+'1��r -' -- City: :� Zip; �.< .- <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make: �` <br /> Model: � "� <br /> Fuel: lU• �:? <br /> I�lue Size: G� <br /> �, <br /> Input BTUs: -���,�'F n — <br /> Output BTUs: _:i <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: � <br /> Make: "�`^ <br /> Model: .,�r�;k `- _; <br /> Tons: - <br /> H. Power <br /> • �8% <br /> •�`� <br /> �� <br />