Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
1 <br /> � <br /> 7. Witlun 5 working days of superstructure removal,a fmal inspection shall be requested. The <br /> site shall be left clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation(except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> S. The undersigned owner shall aild hereby does indemnify and hold hannless the City of <br /> Orono, its agents, einployees and assigns froin and against all claims, danlages, losses or <br /> expenses,including attorney fees,against the City,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> 9. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic taailcs must <br /> be puinped,crushed and filled with native soils. An inspection is required after the tanlcs are <br /> puinped and before the tanks are crushed and filled. <br /> PERMIT TYPE AND FEE CALCULATION <br /> 1�1� $50.00 -Principal Structure M,� �e� C ��y G Wr�� hC�� <br /> $30.00 -Accessory Structure <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE(add lines 1-2 above) $ � � � <br /> The undersigned hereby applies to the City of Orono for issuance of a Deinolition Permit,agrees to <br /> do all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements inade on this application are complete,true and correct. <br /> r �� � <br /> A,PPLICANT'S SIGNATURE <br /> OWNER'S SIGNATUItE: Date: 1�� 1 + d� <br /> APPROVED BY: Date: � � " 1 ��� � <br />