Laserfiche WebLink
` Minnesota Pollution Control Agency <br /> , ' ' Notification of Intent to Perform a Demolition <br /> • �� Type of Notification [ ] Original [ J Amended [ j Project Cancellation <br /> Demolition Contractor• Building Information• <br /> Name: Building Name: <br /> Addcess: Address/Location: <br /> City,State,Zip: <br /> City,State,Zip: � County: <br /> Contact Pcrson: ' Phone Number(s): <br /> Phone Number(s): Age of Bldg.(yeazs): Size of Bldg.(sq.ft.): <br /> Number of Floors Including Basement Level(s): <br /> Building Owner: Present Use of Bldg.: <br /> Name: Prior Use of Bldg.: <br /> Address: <br /> Dates when demolition or intentional burning <br /> will Begin & End <br /> City,State,Zip: <br /> Notification must be postmarked or received ten(10)working days <br /> Contact person: before demolition begins. 'See item#S for emergency demolitions. <br /> Phone Number(s): Both Beginning and Ending dates should be amended in writing as <br /> necessary to reflect current project dates. <br /> If there is>2601inear feet or>160 square feet of Regulated Asbestos-Containing Material (RAC1Vn in the building <br /> to be demolished,it must be removed by a licensed asbestos contractor prior to demolition. The State of 1VIN- <br /> Notice of Intent to Perform an Asbestos Abatement Project must be used to notify for the asbestos removal. <br /> Is nonfriable ACM present in the structure to be demolished ? [ J YES [ j NO <br /> If YES complete items 1-9. If NO comp(ete items 3-9. <br /> 1. If ACM will be left in place for the demolition indicate the amount of Category I and/or Category II <br /> nonfriabte ACM left in place. <br /> Categ.I Lineaz Feet Categ.II Linear Feet <br /> Square Feet Square Feet <br /> Cubic Feet Cubic Feet <br /> -at g�I nonfriable A 1��means asbestos-containing packings, at Q�II nonfriable AGI��means any material,e�ccluding <br /> gaskets,resilient floor covering,and asphalt roofing products Category I nonfriable ACM,containing more than one percent <br /> containing more than one percent asbestos. �sbestos that,when dry,cannot be crumbled,pulverized,or <br /> "Category I nonfriable ACM is not ailowed to remain in place reduced to a powder by hand pressure. <br /> for demolition if it is in poor condition. 'Category II nonfriable ACM is not allowed to remain in place <br /> for demolition if it has a high probability of becoming crumbled, <br /> pulverized,or reduced to a powder during demolition,transport, <br /> • or disposal. (ex transite,cement,slate roofing) <br /> 2. Description & Location of ACM remaining in place (including floor#and room#): <br />