My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
L
>
Lyman Avenue
>
1290 Lyman Avenue - 02-117-23-21-0001
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:06:43 PM
Creation date
6/26/2017 3:17:23 PM
Metadata
Fields
Template:
x Address Old
House Number
1290
Street Name
Lyman
Street Type
Avenue
Address
1290 Lyman Ave
Document Type
Septic
PIN
0211723210001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ O <br /> � � <br /> O O <br /> � �� CITY o� ORONO <br /> � ' Y,� y <br /> T l,—' <br /> ��� � ` � � <br /> \\\v� !� ���. �� , _;� l�r Munictpal Offices <br /> \� ; ,. " � �;`��`�°,�G� Street Address: MailinQ Addross: <br /> '�$Egg04' 2150 Kelley Pa�kway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> February 18, 2000 <br /> Margret Fox <br /> 1290 Lyman Avenue <br /> Wayzata, Mn 55391 <br /> Dear Mr. &Mrs. McMillan: <br /> The above described property is in a Metropolitan Urban Service Area(MUSA) for sanitary sewer <br /> installation. The factors for initiating the sewer project were smaller lot sizes and non-compliant septic <br /> systems with limited replacement sites available. The residence was required to connect to the sewer <br /> system no later than February 14, 2000. Recently, the City Council adopted a resolution allowing all <br /> scwcr conncctions to coincide with the septic system upgradc time frame. The time frame for a scptic <br /> system upgrade is seven to ten years from the inspection date dependant upon the property's location. <br /> Your property will need to connect to the sanitary sewer system no later than December 31, 2008,which <br /> is the date your septic system was to be upgraded. A Sewer Availability Charge (SAC)fee will need to <br /> be paid to the City in the year the sewer connection is made. A licensed plumber must then obtain a <br /> permit from the City to make the connection from the residence to the actual sewer line. <br /> If at any time before December 31, 2008 the residence undergo's a remodeling project that will increase <br /> tlie total water use,the residence must then connect to the sanitary sewer system. If at any time before <br /> the above date the system is failing,the residence must then immediately connect to the sanitary sewer <br /> system. <br /> Minor maintenance can and should still be conducted on your septic system. Pumping the septic tanks, <br /> repairing or replacing pumps, and replacement of septic tank baf�les are examples of acceptable repairs. <br /> If the septic system needs major maintenance, such as septic tank replacement or drainfield replacement, <br /> connection to the sanitary sewer system will be required. <br /> If there aze any questions regarding this letter,please contact me at(612) 249-4600. <br /> Re ect y, <br /> t <br /> Chris Pence <br /> On-Site Systems Manager <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.