My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02811 - mechanical
Orono
>
Property Files
>
Street Address
>
L
>
Lyman Avenue
>
1275 Lyman Avenue - 02-117-23-21-0027
>
Permits/Inspections
>
2000-P02811 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:16 PM
Creation date
6/26/2017 3:03:24 PM
Metadata
Fields
Template:
x Address Old
House Number
1275
Street Name
Lyman
Street Type
Avenue
Address
1275 Lyman Ave
Document Type
Permits/Inspections
PIN
0211723210027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � . � <br /> ? � <br /> f <br /> . <br /> e � � , <br /> ► CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by� mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by retum mail after a review is completed. PERMITS ARE NOT VALID UNTIL <br /> YOU RECEIVE A PERMIT. WORK MtiST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON <br /> THE JOB SITE. <br /> 3. Mechanical DesiQns - Complete calculations, details and specifications are required for each heating, �. <br /> ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipmen[ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodelinQ is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. <br /> 6. All work must be inspected(rough-in and final). Call 249-4600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600. <br /> Please check one: New Addition Repair �--Iteplace <br /> i/Residential Commercial <br /> JOB SITE: i a`Z 5 L�w.A r�+ ��v C Zip: <br /> Owner's Name: w.c vv����n 1-J Telephone Number: <br /> Mailing Address: SAw.c- City: Zip: <br /> Contractor's Name: c`(��,i N"C2v S ,�n c Telephone Number: �� � - ���o <br /> Mailing Address: � S �� l-� � �,,�t�� � �-- City: M l�P�C Q(,A�u Zip: 5'S 3 S 4 <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: � <br /> Make: (3 2�t1��� <br /> Model: 33 3 c3�vvtop►a o <br /> Fuel: N A'i�- GAS <br /> Flue Size: <br /> Input BTUs: ��e <br /> Output BTUs: �,,�,p o <br /> CFM: �- <br /> 2_0�2� <br /> COOLING SYSTEMS <br /> Quantity: 't <br /> Make: (3a�{AN i <br /> Model: SSo�xau� <br /> Tons: �( -r-o r� <br /> - H. Power <br />
The URL can be used to link to this page
Your browser does not support the video tag.