My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P03410 - new septic
Orono
>
Property Files
>
Street Address
>
L
>
Lyman Avenue
>
1280 Lyman Avenue - 35-118-23-34-0014
>
Septic
>
2000-P03410 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:59:10 PM
Creation date
6/26/2017 2:32:51 PM
Metadata
Fields
Template:
x Address Old
House Number
1280
Street Name
Lyman
Street Type
Avenue
Address
1280 Lyman Avenue
Document Type
Septic
PIN
3511823340014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
View images
View plain text
• • r <br /> S�P TES TING� I��. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License#394 <br /> /2 sa �y��.n A��� <br /> REVISED <br /> October 9, 200� <br /> Archetype Builders� lnc. <br /> Lot 1, Lyman Woods <br /> Orono, Henn. Co., MN <br /> This on-si#e sewage treatment system is designed for a Type 1, four bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and toca! <br /> ordinances. <br /> The soils on this site are SCS soils mapped - EnC - Erin loam. The seasonally <br /> saturated soils were located at 12" #016" (mottted soil). Due to the seasonally saturated <br /> sails, a Pressurized Mound System will need to be instalfed to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. <br /> An Interceptor Drain will need to be installed 10' from the tce of the mound a minimum of <br /> 4' deep using drain tile with filter cloth. The first 100'will be backfilled with 3/4" to 2-1/2" <br /> diameter roc{c writhin 12" of the surface and finish off the backfille wi#h loam soil. The <br /> total lin.ft. of tile is 180'. <br /> The soils at a depth of 12" have a percotation rate of 30.0 mpi. <br /> A lift pump will be needed in the lower level to keep the tanks shallow� 75' from the <br /> wetland. <br /> A pumping chamt�r will need to be installed to tift the effluerrt to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather pr�f enclosure. A waming device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).