Laserfiche WebLink
. , <br /> 6. Page 2, Item 5: Refer to the Architectural Drawings for window and door schedules� <br /> 7. Page 2, Item 5: Stairs will be custom-fabricated on site.� <br /> 8. Page 2, Item 6: Refer to attached Exterior Envelope Average "U" Value Computation for� <br /> individual material and assembly U-values. <br /> 9. Page 2, Item 7: The selected mechanical subcontractor will generate designs for plumbing� <br /> and HVAC systems. That information will be turned over to you upon application for <br /> permit for those portions of the project. <br /> 10. Page 2, Item 8: Refer to attached Project Manuat containing technical specifications for� <br /> the project. <br /> 1 1 . Page 2, Item 8: Refer to attached Exterior Envelope Average "U" Value Computation for � <br /> material and assembly U-values. <br /> 12. Page 3, Item 9: Application for driveway access permit will be made ASAP, and copy of� <br /> same will be submitted upon receipt. <br /> 13. Previously, septic design and test reports were submitted for approval of the plat. Per my <br /> 01/22/00 telephone conversation with Paul Weinberger and Chris Pence, existing reports <br /> were deemed adequate for issuance of the Building Permit, but ultimately a new report will <br /> need to be prepared specific only to our site. S-P Testing is in the process of preparing such <br /> a report. Also: <br /> a. A drain field covenant will be drawn up for execution <br /> b. Primary and secondary drain fields will be fenced-off before this permit is issued, <br /> including 20'-0" buffer. <br /> Survey Requirements for All Residential Construction <br /> 1 . Page 5, Item 3: The new structure has been staked on site� <br /> 2. Page 5, Item 4: Primary and secondary septic sites have been staked on site, including 20'-� <br /> 0" buffer. <br /> 3. Page 5, Item 6: Refer to Architectural Drawing Sheet AO for lines of proposed deck and � <br /> porch. <br /> 4. Page 5, Item 7: Refer to Architectural Drawing Sheet AO for areas of Lot 1 and Outlot B.✓ <br /> 5. Page 5, Item 8: Refer to Architectural Drawing Sheet AO for topography at driveway access� <br /> to Lyman Avenue. If additional information is required, please advise this office, and field <br /> work will be performed immediately. <br /> 6. Page 5, Item 9: Refer to Architectural Drawing Sheet AO for floor elevations. Drawing✓ <br /> Sheet S1, Foundation Plan, contains footing and block foundation information. <br /> 7. Page 5, Item 11 : Refer to Architectural Drawing Sheet AO for topography at lot corners. If� <br /> additional information is required, please advise this office, and field work will be <br /> performed immediately. <br /> Exterior Envelope Energy Code Computation Worksheet <br /> 1 . Pages 14 and 15: Refer to attached Exterior Envelope Average "U" Value Computation.�� <br /> Minnehaha Creek Watershed District <br /> 1 . Pa e 24: A lication for erosion control ermit will be submitted to the Watershed District� <br />