My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P03019 - new septic
Orono
>
Property Files
>
Street Address
>
L
>
Lyman Avenue
>
1250 Lyman Avenue - 35-118-23-34-0015
>
Septic
>
2000-P03019 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:59:14 PM
Creation date
6/26/2017 2:03:54 PM
Metadata
Fields
Template:
x Address Old
House Number
1250
Street Name
Lyman
Street Type
Avenue
Address
1250 Lyman Avenue
Document Type
Septic
PIN
3511823340015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , � � ,, �� c�� � <br /> f _x�7�P TES TIMG� I�C. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License#394 <br /> September 5, 2000 <br /> Lauer Homes, Inc. <br /> Lot 2, Block 1 <br /> Lyman Woods <br /> Orono, Henn. Co., MN <br /> This site was originally tested in November of 1990. The sites were re-evaluated and <br /> the mottled soil depths were verified in the soil borings by compieting soii probings at the <br /> original soil boring locations. Two additional soil borings were completed #5 &6 due to <br /> the lot line changing since the original design. <br /> This on-site sewage treatment system is designed for a Type 1, four bedroom home, in <br /> accordance with the Minnesota Poilution Control Agency Chapter 7080 and I�al <br /> ordinances. <br /> The soils on this site are SCS soils mapped - EnC - Erin loam. The seasonally <br /> saturated soils were located at 12" to 18" (redox features). Due to the seasonally <br /> saturated soils, a Pressurized Mound System will need to be installed to treat septic <br /> effluent. The bottom of the rock must be tocated at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate of 21.8 mpi. <br /> A pumping chamber will need to be instalted to lift the eifluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A waming device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.