Laserfiche WebLink
%' O <br /> � � <br /> O. :', O <br /> y �� CITY of ORONO <br /> �r �. <br /> ,a '��� � ,, < `:� �„ <br /> r�`„ w MunicipalOffices <br /> �,.� ,��'�� ,��,�� ,(�., ,tilC� <br /> �� ����'�,���������!i'�`;,'�����'�yG Street Address: MailinQ Address: <br /> ��$Egg04' 2750 Kelley Parkway P.O. Box 66 <br /> �' - -= Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> February 22, 2000 <br /> C. Paul& Rae H. Pesek <br /> 1235 Lyman Avenue <br /> Wayzata, Mn 55391 <br /> Dear Mr.& Mrs. Pesek: <br /> The above described property is in a Metropolitan Urban Service Area (MUSA) for sanitary <br /> sewer installation. The factors for initiating the sewer project were smaller lot sizes and non- <br /> compliant septic systems with limited replacement sites available. The septic system serving <br /> your home is a compliant system according to State and City standards. Your property was <br /> exempted from connecting to the sanitary sewer system at that time. <br /> The existing septic system serving your home may stay in use until the system becomes non- <br /> compliant. If for any reason the septic system becomes non-compliant, the home must then <br /> connect to the sanitary sewer system If the home undergo's a remodeling project that will <br /> increases the total water use, the home must then connect to the sanitary sewer system. <br /> Minor maintenance can and should still be conducted on your septic system. Pumping the septic <br /> tanks, repairing or replacing pumps, and replacement of septic tank baf�les are examples of <br /> acceptable repairs. If the septic system needs major maintenance, such as septic tank <br /> replacement or drainfield replacement, connection to the sanitary sewer system will be required. <br /> If there are any questions regarding this letter, please contact me at (612) 249-4600. <br /> Respectfully, <br /> Chris Pence <br /> On-Site Systems Manager <br /> Telephone(612)?A9-4600 • Fax(612)249-4616 <br />