My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01172 septic
Orono
>
Property Files
>
Street Address
>
L
>
Lyman Avenue
>
1190 Lyman Avenue - 35-118-23-43-0034
>
Septic
>
2010-01172 septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:59:45 PM
Creation date
6/22/2017 2:00:35 PM
Metadata
Fields
Template:
x Address Old
House Number
1190
Street Name
Lyman
Street Type
Avenue
Address
1190 Lyman Avenue
Document Type
Septic
PIN
3511823430034
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> � Pump Selection Design ,;��`, � <br /> SEWAGE yN .,;•�, ., <br /> Minnesota Pollution Worksheet r r,r���,��,r <br /> Control A enc ` ��� "�'��,�r" <br /> , 1. PUMP CAPACITY <br /> 1. Pumping to Gravity Distribution <br /> A. Minimum discharge is 10 GPM(15 GPM recommended) �GPM <br /> � B. Maximum discharge is 45 GPM <br /> 2. Pressure Distribution <br /> � �Individual SSTS �Collettion System <br /> Required Flow Rate (Line 11 of Pressure Distribution or Line 10 of Non-Level) 3$,Q GPM <br /> , c. �istribution to: p Soil Treatment Unit ❑Media Filter ❑ATU p Other <br /> 2. HEAD REQUIREMENTS <br /> � o�veatme,tt:ysten, <br /> 3. Elevation Difference �$ ft 8yointotd�scharge <br /> � between pump and point of discharge: h / . tl <br /> �c,��� <br /> NOTE:IF system is an individual subsurface sewage treatment nlct D��� � Ekvation%� <br /> ' system, complete steps 4-9. If system is a Co!lection System, c ml �H�e <br /> skip steps 4, 5,7 and 8 and go to Step 10. <br /> � i <br /> ' ----------------------------- ------------- <br /> 4. Distribution Head Loss: �Q ft <br /> � 5. Additional Head Loss: ft(due to special equipment,etc.) <br /> � <br /> ' Distribution Head Loss ncdon Loss�n P ast�c pe per <br /> Gravity Distribution = Oft G=130 <br /> Pressure Distribution based on Minimum Average Head Nominal Pipe Diameter <br /> Value on Pressure Distribution Worksheet: F OYV Rdte � �,y+ �� 2 3 <br /> � GPM __- <br /> Minimum Avera e Head Distribution Head Loss �p 9.11 3.08 1.27 0.31 <br /> 1ft 5ft <br /> 2ft bft �2 12.77 4.31 1.78 0.44 --- <br /> ' 5ft 1 oft 14 16.99 5.74 2.36 0.58 --- <br /> 16 7.35 3.03 0.75 0.10 <br /> 6. A.Supply Pipe Diameter: 2,QQ in 18 --- 9.14 3.76 0.93 0.13 <br /> � B.Supply Pipe Length: 2�Q ft <br /> 20 --- 11.11 4.58 1.13 0.16 <br /> 25 16.79 6.92 1.71 0.24 <br /> 7. Based on Friction Loss in Plastic Pipe per 100ft from Table I: 30 --- --- 9.69 2.39 0.33 <br /> � 35 --- --- 12.90 3.18 0.44 " <br /> Friction Loss= 3.(�] ft per 100ft of pipe 40 ___ -_ 16.52 4.07 0.57 <br /> � 45 --- --- --- 5.07 0.70 <br /> g, Determine Equivalent Pipe Length from pump discharge to soil dispersal 50 ___ ___ ___ 6.16 0.86 <br /> � area discharge point. Estimate by adding 25%to supply pipe length for ___ --- ___ <br /> fitting loss. Supply Pipe Length(5.8) X 1.25=Equivalent Pipe Length 55 7.35 1.02 <br /> 60 8.63 1.20 <br /> 2�Q ft X 1.25 = 2G 2�5 ft 65 -- --- --- 10.01 1.39 <br /> � �� --- --- --- 11.48 1.60 <br /> 9. Calculate Supply Friction Loss by multiplying Friction Loss Per 100ft (Line 6)by the Equ�valent Pipe Lengt (Line 7)an ivi e y 100. <br /> Supply Friction Loss= <br /> 3.67 ft�r�oort x 262,5 rt + �oo = 9,6 ft <br /> � <br /> ' <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.