My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01172 septic
Orono
>
Property Files
>
Street Address
>
L
>
Lyman Avenue
>
1190 Lyman Avenue - 35-118-23-43-0034
>
Septic
>
2010-01172 septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:59:45 PM
Creation date
6/22/2017 2:00:35 PM
Metadata
Fields
Template:
x Address Old
House Number
1190
Street Name
Lyman
Street Type
Avenue
Address
1190 Lyman Avenue
Document Type
Septic
PIN
3511823430034
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> 7. APPROXIMATE MOUND MATERIAL CALCULATIONS: <br /> , A. Calculate Bed (rock) Volume: Bed Length (2.C)X Bed Width (2.6)X Depth = Volume (ft3) <br /> 50.0 ft X 10.0 ft X 1.0 = 500.0 ft3 <br /> � Divide ft3 by 27 ft'/yd'to calculate cubic yards: <br /> 500.0 ft3 = 27 = 18.5 yd' <br /> � Add 20%for constructability: 18.5 yd3 X 1.2 = 22•2 yd3 <br /> B. Calculate Clean Sand Volume: <br /> � Upslope Volume: ((Ups(ope Mound Height - 1)x 3 x Bed Length) =2 =cubic feet <br /> (( 3.0 ft - 1) X 3.0 ft X 50.0 )=2 = 150.0 ft3 <br /> Downslope Vo(ume: ((Downslope Height- 1) x Downslope Absorption Width x Media Length)T 2=cubic feet <br /> � (( 3.5 ft - 1) X 16.7 ft X 50.0 )+2= 1041.7 ft3 <br /> Ends(ope Volume: (Downs(ope Mound Height - 1) x 3 x Media Width =cubic feet <br /> � ( 3.5 ft - 1 ) X 3.0 ft X 10.0 ft = 75.0 ft3 <br /> Volume Under Rockbed: Average Sand Depth x Media Width x Media Length = cubic feet <br /> � 1.3 ft X 10.0 ft X 50.0 ft = 625.0 ft3 <br /> Total C(ean Sand Volume: Upslope Volume + Downslope Volume + Endslope Volume + Vo(ume Under Media <br /> � 150.0 ft3 + 1041.7 ft3 + 75.0 ft3 + 625.0 ft3= 1891.7 ft3 <br /> Drvide ft3 by 27 ft3/yd3 to calculate cubic yards: 1891•� ft3 : 27 = ��•� yd3 <br /> � Add 20%for constructability: 70.1 yd3 X 1.2 = 84•1 yd3 <br /> C. Calculate Sandy Berm Vo(ume: <br /> Total Berm Volume(approx): ((Avg. Mound Height - .5 ft topsoil)x Mound Width x Mound Length) =2=cu. ft. <br /> � ( 3.3 _ 0.5 )ft X 40.7 ft X 78.0 )=2 = 4360.4 ft3 <br /> Total Mound Vo(ume- C(ean Sand volume-Rock Vo(ume= cubic feet <br /> � 4360.4 ft3 - 1891.7 ft3 - 500.0 ft; = 1968.8 ft3 <br /> Divide ft3 by 27 ft'/yd3 to calculate cubic yards: 196$•8 ft3 : 27 = �2•9 yd3 <br /> � Add 20%for constructability: 72.9 yd3 x 1.2 = 87.5 yd3 <br /> D. Calculate Topsoil Materia!Vo(ume: Total Mound Width X Total Mound Length X.5 ft <br /> , 40.7 ft X 78.0 ft X 0.5 ft = 1585.6 ft' <br /> Divide ft' by 27 ft3/yd3 to calculate cubic yards: 1585.6 ft3 ; 27 = 58.7 yd' <br /> � Add 20%for constructability: 58.7 yd3 x 1.2 = 70•5 yd3 <br /> � I hereby certify that I have completed this w rk in r nce ith all applicable ordinances, rules and laws. <br /> I � , <br /> �' � 1� Il� lv <br /> , (Designer) ( na ur (License#) (Date) <br /> � <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.