Laserfiche WebLink
� . � ��$ �� <br /> CITY OF ORONO SEPTICSYSTEI�IPERi��IITAPPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, I�i� 55323 _ <br /> JOB STTE ADDRESS: �f 70 � �,-��� ��' �� <br /> Occupancti� Type: Residential X Commercial Other <br /> - -. <br /> Permit Tti•pe: IV'esv or Replacement System, � �100.0 /���� � c�C�� <br /> Repair Existing System, � 50.00 ' <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees � <br /> , *See fee schedule for non-residential permit fees <br /> � * �a �I���� % ]?�ioneNumber: <br /> Owner s Itiame: ���� /�Zc� � �- <br /> Nlailing Address: � 7 ,L �w �a�+�� i�--c�� E= City: �P•, _ <br /> Contractor's Ir'ame: � : ���� , Phonel�Tumber: ' �� �S���` <br /> , �,� <br /> 1�Iailing Address: �r_�Z� ,��� �1�� ��, /2_ � City:Ci_(;,�.� {�.�} Z�p: �S � <br /> DO \'OT I�IA_II� PAYIti'IENT tii�I'TH THIS APPLICATION <br /> GE\rERAI� Lti'STRUCTIO�tS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will no[ be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not be�in unless the permit card is on the job <br /> site. <br /> 2, permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system desi�n. Desi�n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the Ciry Inspector. <br /> 4. The followin� inspections will be required for all septic systems: _ <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to coverin;. For mounds, inspection is required <br /> afrer rouQh-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipin; installation in the rock bed. <br /> D. Final inspection to verify proper final cover dep[hs and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holdin�NIPCA Installer Cercificate shall be present durin� inspections: A 2`�' <br /> hour notice is required for all inspections. <br />