Laserfiche WebLink
, . <br /> Mr. Donald C. Mogen <br /> Page 2 <br /> August 2, 1978 <br /> Results <br /> The log of soils encountered in the borings is shown on the <br /> attached soil boring log sheets. Groundwater was not encountered in <br /> the borings. <br /> Percolation tests indicated the following percolation rates in ' <br /> minutes per inch (mpi) : <br /> Surface <br /> Test No. Elevation Hole Depth Soil at Test Depth Rate, mpi <br /> P-1 90.0 33" siity ciay (cL) 120.0 <br /> P-2 87.7 33" Silty Clay (CL) 30.0 <br /> P-3 89.3 33" Silty Clay (CL) 40.0 <br /> P-4 86.8 30" Sandy Clay (CL) 18.5 <br /> P-5 90.8 33" Silty Clay (CL) 48.0 <br /> P-6 87.6 30" Sandy Clay (CL) 30.0 <br /> Recommendations <br /> Based on the results of the soil borings and the percolation <br /> tests, it is my opinion that the soil and water condit=ons on the <br /> site are suitable for the installation of an individual sewer system <br /> with a drainfield as the soil absorption unit. It is suggested that <br /> the drainfield be designed using the average percolation rate of <br /> 47.7 mpi. <br /> For a three bedroom house constructed on the site, the recommended <br /> drainfield absorption area should be 915 square feet. Only trench <br /> bottom area is considered as being effective. With standard two foot <br /> width trench, 458 linear feet of tile line would be required. <br /> We recommend that two septic tanks be used at the site. The <br /> first should have a capacity of at least 900 gallons and the second <br /> a capacity of from 500 to 900 gallons. Recommended locations are <br /> shown on the attached figure. Detailed plans should be prepared by <br /> your contractor. <br /> Topographically, it is apparent that a slight amount of levelling <br /> will be required at the drainfield area. You indicated that the proposed <br /> house will be a rear walkout, Therefore, the secondary drainfield <br /> site is assumed to be simply expansion of the primary site to the rear <br /> of the house. This allows for gravity fall from basement facilities. <br /> Based on the results of the soil borings, it appears that ground- <br /> water levels will not be a problem at the site. <br />