My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00978 - demo
Orono
>
Property Files
>
Street Address
>
L
>
Lillian Lane
>
2845 Lillian Lane - 33-118-23-34-0018 - New Address
>
185 Old Crystal Bay Rd N - 33-118-23-34-0001 - Old Address
>
Permits/Inspections
>
2015-00978 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:51:01 PM
Creation date
6/21/2017 11:54:53 AM
Metadata
Fields
Template:
x Address Old
House Number
2845
Street Name
Lillian
Street Type
Lane
Address
2845 Lillian Lane
Document Type
Permits/Inspections
PIN
3311823340018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ` <br /> 4. Submit a $2,500 escrow and an escrow agreement signed by the property owner(copy attached). <br /> 5. Keep all structure(s) enclosed and/or secured until such time as demolition is complete. <br /> 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific prior <br /> approval is obtained in writing for temporary use thereof. <br /> 7. Completely remove foundation(s) from the ground. <br /> 8. Completely dispose of all demolition debris off site in accordance with all applicable PCA requirements. <br /> 9. Abandon water wells in accordance with State Health Department regulations. <br /> 10. Call for an inspection when all debris has been removed, before backfilling. <br /> 11. Within 5 working days of superstructure removal, a final inspection shall be requested. The site shall be <br /> left clean and clear of all debris, with any excavation filled with earth level with the adjacent ground <br /> elevation (except when such excavation is to be used as part of a new building and such new building is <br /> actually under construction). <br /> 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, crushed <br /> and filled with native soils. An inspection is required after the tanks are pumped and before the tanks are <br /> crushed and filled. <br /> 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, <br /> employees and assigns from and against all claims, damages, losses or expenses, including attorney <br /> fees, against the City, its agents, employees and assigns arising out of or resulting from the demolition <br /> described herein as performed by the property owner, his employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> ❑ $75.00 — Principal Structure $ �7� �=' C' <br /> ❑ $50.00 —Accessory Structure x�(how many) 6fJ,UG� ` <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge 1.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do <br /> all the work in a strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are complete, true and correct. <br /> / � `��� � /' -l � <br /> Applicant's Signature: L��/:�y/ ' ___ ,� Date: � �- � - <br /> , � <br /> Owner's Signature: ' �� Date: Fr -f -/5� <br /> Approved By: .��c7(� Date: � `� <br /> ( uilding Official) <br /> * Zoning Disclosure Required? ❑ YES NO <br /> *This must be filled out by Zoning Department-For her answer, a Zoning Official must sign all applications. <br /> * Approved By: ��"I V� Date: ���—'` � <br /> (Zoning Official) <br /> Form Last Updated: July 2015 <br /> 150784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.