Laserfiche WebLink
� o� <br /> O ti?a�v O <br /> ��� CITY of ORONO <br /> ,� �,�����1���, � <br /> '�'+�� �� , a�;, ;�5,;. G�E�r Municipal offices <br /> `�`� Street Addross: Mailin�Addross: <br /> � �s� '� <br /> `�'Egg04' 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> Owner: L S Address: 185 Old Crystal Bay Rd. N. <br /> Permit #'s: 1171 Dates: 6/28/66 Contractors: Bill Stubbs <br /> (This is [x] an existing system [ ] new construction) . <br /> SYSTEM COMPLIANCE (1-3) : 3 <br /> 1 Code System: Meets or exceeds current City standards in all respects relating to design, <br /> construction, and location. Appears to be operating properly. <br /> 2 Compliant System: Does not meet all current City standards for new construction, but in <br /> most respects appears to be designed, located, and constructed in accordance with previous <br /> Q codes and is functioning properly. <br /> Non-Compliant System: System may or may not meet current City standards for design, <br /> construction, or location, but is failing to properly treat and dispose of the current <br /> input; and any system with less than three feet of vertical separation between the bottom <br /> of the drainfield and the saturated soil level. <br /> (The saturated soil level [jl] has or [ ] has not beea identified at this tima. If the <br /> saturated soil lavel has not beea identified, this classification is subject to revision.) <br /> TANK CONDITION (5-9) : 9 <br /> 5 Pumpout not needed at this time. <br /> 6 Solids accumulation in tanks indicates they should be pumped out this year. <br /> 7 System is discharging to the surface. Tanks must be pumped out within 48 hours. <br /> 8 Inspection risers missing-tanks could not be inspected. If tanks have not been pumped out <br /> within three years, they should be pumped out and risers installed now. <br /> 9Q Inspection pipe is located over tank baffle-can not measure solids accumulation. If tanks <br /> have not been pumped out within three years, they should be pumped out now. <br /> (Duriny tha last septic tank Maintenance Pumpout the tanks [ ] were or [�] were not con£irmad <br /> to be watertiQht by the liceased pu�iaQ coatractor. If the tanks were not confirmed to be <br /> watartiQht, this classification is subject to ravision.) <br /> D INFIELD CONDITION (11-14) : il <br /> 1 Drainfield is dry, no surfacing evident. <br /> Some evidence of surfacing, not critical yet. Repair is not required at this time. <br /> 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. <br /> Contact the City Inspector immediately. Repair must be completed within 90 days. <br /> ' 14 Drainfield extent and condition unknown. <br /> POTENTIAL FOR SYSTEM FAILURE: (system age and condition, soils, etc.) : madium <br /> CONIl�IENTS: In order to confirm that your septic system meets Minnesota standards, soil borings <br /> were performed to verify a 3 foot separation between the drainfield and the seasonal water <br /> table. The separation is 0 feet and the system is non-compliant. Repair or replacement of the <br /> septic system is required by 12/31/2007. <br /> ��-9� <br /> Date of Inspection S tic System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a <br /> transfer of property, this report does not guarantee that an existing system will continue to <br /> function properly, but indicates the operation of the system under current conditions. <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />