Laserfiche WebLink
• ,�. '. <br /> , , <br /> , <br /> EROSION CONTROL SUPPLEMENTAL INFORMATION FORM <br /> INSPECTION PLAN REQUIREMENTS <br /> 1. Routine Inspections: <br /> • Once every seven days during active consh-uction <br /> • Within 24 hours of a half inch or more precipitation <br /> 2. Completed Field Inspection Reports: <br /> • Reports available within 24 hours of request until MCWD determines project is complete& <br /> stabilized <br /> Failure to submit requested inspection information will result in a site inspection and may be subject to <br /> reimbursement for MCWD staff time. <br /> Who witl inspect your site regularly? <br /> NAME• Michael Sundet ORGA1vIZATION: Stonewood <br /> PHONE• 9522504404 ALTERNATE PHONE: 6124624000 <br /> EMAIL: michael@stonewood.com <br /> Where is the concrete washout Iceation? <br /> �LSJFF SITE OR CONTAINED ON TRUCK <br /> ❑ INDICATED ON SITE PLAN(with required impermeable liner) <br /> ❑ N/A <br /> What is the final stabilization method? <br /> (seed,sod,etc.): Sod <br /> 6 inches of topsoil must be added/replaced prior to final stabilization <br /> Will protective fencing for retained vegetation be installed? <br /> � YES <br /> ❑ NOT APPLICABLE <br /> ❑ OTHER(describe) <br /> I certify that I am familiar with the requirements of t6e MCWD Erosion Control Rule and that the <br /> proposed tivi y w'll be conduct i compliance with this rule. <br /> 4/22/16 <br /> Signa re of App icant or Aut rized Agent Date <br /> MINNEHAHA CREEK <br /> WATERSFIED DISTRICT <br /> OVALIiY Oi M�ATlR,QVALItY Of UfE <br />