My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
L
>
Luce Line Ridge
>
165 Luce Line Ridge - 31-118-23-34-0008
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:31:36 PM
Creation date
6/20/2017 10:59:29 AM
Metadata
Fields
Template:
x Address Old
House Number
165
Street Name
Luce Line
Street Type
Ridge
Address
165 Luce Line Ridge
Document Type
Septic
PIN
3111823340008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�o� <br /> O�'.`:� O <br /> ���=�a�� CITY of ORONO <br /> . � <br /> , �:.�. <br /> ,�, A 51. r.�;�.�_�, �„ <br /> � � �.� I�`;' ,�,ti Municipal Ofltices <br /> ���������`.�y Street Addross: Mailin�Addross: <br /> �;.c."•.t¢ G <br /> % � rji� <br /> ��;gg0 2750 Keiley Parkway P.O. Box 66 <br /> Orono, MN 55356 � Crystal Bay, MN 55323-0066 <br /> Owner: �0 5�-�� �--��r G� Address:_ �6 S Lv« � ;,�� �:d o��. <br /> Cin•Ordinance 199 requires that each existing on-site sewage treatment system in Orono be inspected every nvo years. <br /> The on-site sewage treatment system at the above address has been inspected and appeazs to fall into the categories checked below. <br /> SYSTEM CONFORNIITY (1-3L' ( <br /> Ol °CODE SYSTEM" An ISTS which meets all the locatioq design and coasttuction standazds ofthe current Orono Municipal Code. <br /> 2 "CONIPLIANT SYSTEM" An ISTS which does not meet all the locatioq design and constivction standards ofthe cunent Orono�funicipal <br /> Code but does meet the three foot sepazation nquiremrnt,and which is not failing or an imminrnt threat W public health or safety. <br /> 3 "NON-COMPLIANT SYS'TEM" A prohibited ISTS;an ISTS located within a daignated 100-year flood plain,any ISTS which may <br /> or may not meet all the locatioq design,or coustruction staadardg of the cucrrnt Orono�funicipai Code and which is failing for any reason;and <br /> any ISTS with tess than three faet oFunsaturated soil or sand between the disttibution device and ihe limiting soil characteristics. <br /> T?..'�1IC CONDITION(5-10): S <br /> T;Lnk inspection indicates: . <br /> UPumpout not needed at this time. <br /> f) Tarilc must be pumped out this year (city code requires tanks to be pumped out avery 3 yeazs. Tank wu last pumped ��-3- o��1 ) <br /> 7 Solids accumulation in tanks is at a critical a critical level. Tanks should ba pumped out at soon as possibto. <br /> 8 System is discharging to tha surface. Tanks must be pumped out within 48 hours to eliminate surface discharge. <br /> 9 Insptction risers missing-tanks could not be inspected Inspection risers(4"dia pipe)must be uutalled in each tank at next pumpout If tanlcs <br /> hava nut been pumpad out withitt the last three years,thay should be pumped out now. <br /> 10 Inspection pipe is located directly over tank ba81e(dors not give accurate measuremrnt of solids accumulation). If tanks have not bern pumped <br /> aut within tha lut threa yeazs,they should be pumped out now. <br /> DRAIIv'FIELD CONDITION 11-1�: \\ <br /> 11 Drainfield is dry,no surfacing evidrnt <br /> 1? Soma evidrnca of surfacing,not critical yet , <br /> 13 Drainfield is saturated and visibly dischatging untreated egluent to the surface. Contact the City Inspector immediately.Repaiis must be <br /> completed within 90 days. <br /> 1� Drainfiald e:ttent and condition unknown <br /> COMI�IENTS: s'�S're�`— �oo\�S b � _ <br /> � -1� — b \ �� <br /> . Date of Inspection Septic System Inspector ' <br /> Note: In the evrnt that this inspection repoR is used to satisfy the requirementt for a moRgage or otha haasfa of property,be advised that t}sis repoR doa not guarantee <br /> or certify that an e�sting system will continue to function properly,but is merely an opinion of the adequacy of the system under current conditions based on the available <br /> informatioa <br />
The URL can be used to link to this page
Your browser does not support the video tag.