My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01465 - detached garage
Orono
>
Property Files
>
Street Address
>
L
>
Luce Line Ridge
>
135 Luce Line Ridge - 31-118-23-34-0007
>
Permits/Inspections
>
2016-01465 - detached garage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:31:21 PM
Creation date
6/20/2017 10:54:12 AM
Metadata
Fields
Template:
x Address Old
House Number
135
Street Name
Luce Line
Street Type
Ridge
Address
135 Luce Line Ridge
Document Type
Permits/Inspections
PIN
3111823340007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Tuesday, December 20, 2016 11:08 AM <br /> To: Christine Mattson <br /> Subject: RE: 135 Luce Line Ridge/#2016-01465 <br /> Stamped grading plan approved <br /> From:Christine Mattson <br /> Sent:Tuesday, December 20, 201610:17 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject: FW: 135 Luce Line Ridge/#2016-01465 <br /> Adam, <br /> Below is updated information. The file is in your inbox. Thank you! <br /> From: Mike Johnsrud [mailto:mhiohnsrud@comcast.net] <br /> Sent: Monday, December 19, 2016 5:55 PM <br /> To:Christine Mattson<CMattson@ci.orono.mn.us>; brian@bvconstructiomm�.com <br /> Cc: Irci@earthlink.net; Roger Peitso<r�eitso@ci.orono.mn.us> <br /> Subject: RE: 135 Luce Line Ridge/#2016-01465 <br /> Christine, <br /> Our survey is complete and I will be bringing it in tomorrow morning. Also, as we discussed on the phone, <br /> here are the answers to the other items you addressed in your letter dated 12/8/2016. <br /> 1. Certificate of Survey. I will bring in the revised survey tomorrow <br /> a. a.i - Contours - Complete <br /> b. a.ii —General information. We will not be disturbing the area where this building is <br /> going. The building is framed "pole type"but the building will look like it was stick <br /> framed. There will not be typical foundation disturbances because this is not a typical <br /> excavated foundation. The area where this building is going is relatively flat as outlined by <br /> the contours. <br /> i. Erosion control —The ground is frozen and snow covered and there won't be erosion <br /> because there is not a typical excavation. <br /> ii. Construction access —the access will be our driveway (approx. 150�. If you <br /> referring to tire/wheel debris possibly getting into the street, again, this will not be a <br /> typical excavation and no material will need to be hauled away. <br /> iii. Stockpile location — I assume you mean for excavation. We will be boring holes (not <br /> the typical excavated foundation). If you would like, I can place erosion control logs <br /> around the perimeter of the area. No material will need to be stockpiled for hauling <br /> away. <br /> c. a.iii —Grading plan —Again, the area where this building is going is relatively flat. Grading <br /> is not necessary for placement of this building. I asked the surveyor about this item <br /> specifically and he did not place any erosion control because there isn't any excavating <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.