My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00021 - attached garage
Orono
>
Property Files
>
Street Address
>
L
>
Luce Line Ridge
>
135 Luce Line Ridge - 31-118-23-34-0007
>
Permits/Inspections
>
2016-00021 - attached garage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:31:21 PM
Creation date
6/20/2017 10:53:59 AM
Metadata
Fields
Template:
x Address Old
House Number
135
Street Name
Luce Line
Street Type
Ridge
Address
135 Luce Line Ridge
Document Type
Permits/Inspections
PIN
3111823340007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STRUCTURAL NOTES <br /> Unless noted otherwise on the plans and/or in the details,these notes shall apply. If there are <br /> discrepancies between the plans/details and these notes,the contractor shall conForm to the more <br /> stringent requirements,unless clarified with the Structural Engineer of Record(SER)prior to work. <br /> MATERIAL STRENGTHS <br /> Struetural Lurr�ber <br /> All dimensional lumber-#2 Spruce Pine Fir(SPF)or equal <br /> Treated lumber-#2 Southern Pine or equal <br /> C�3C3RDINATION-ARCHITECTURAI�CML,MECHANICAL AN[)ELECTRICAL ITEMS <br /> Contractor shall verify all dimensions and conditions on site and on the plans before construction begins. <br /> All discrepancies shall be reported immediately. <br /> Location,dimensions and details of recesses,depressions,openings,and equipment supports shall be <br /> verified by reference to architectural,civil,eledrical and mechanical drawings. <br /> E)QSTIMG CONDITIONS <br /> Contrador shall verify all dimensions,elevations,and details of existing structure where they affed the <br /> structural work. Notify archited and SER if there are any deviations from the contract documents. <br /> Contractor shall field verify dimensions and elevations prior to fabrication of strudural members. <br /> Remove and replace existing architedural,electrical,mechanical,structural,civil,and miscellaneous as <br /> necessary. <br /> SHORING <br /> General Contrador shall be responsible for temporary shoring for existing construction until new <br /> construction is in place and properly anchored in final fo�m. <br /> Shoring loads for existing strudure not shown in documents to be determined by an engineer licensed in <br /> the state in which the project is located. <br /> Shoring shall be designed and certified by an engineer licensed in the state in which the project is located <br /> and the final design shall be submitted to SER for review. <br /> TEMPORARY BRAQNG <br /> All s#rue#ural r�er�bers are desigRed#or in-plaee loads. CoRtraetor is responsible for braeiflg,wi#hou# <br /> overstressing,all structural elements as required at al�stages of construction until completion of this <br /> project. <br /> Provide temporary lateral support for all waUs until walls are adequately braced by permanent structure. <br /> Provide required temporary bracing for structural steel until permanent bracing and walts are in place. <br /> STRUCTURAL STEEL <br /> All s#rut#ural s#eel sball be desig�ed,#abricatecl,aAd ere�.#ed aeeordiRg#o#be spee�Eatiofls o##he <br /> American Institute of Steel Construdion(AISC)Latest Adoption. <br /> Modification of structural steel members in the field is not permitted without written approval by the SER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.