My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01108 - new septic
Orono
>
Property Files
>
Street Address
>
L
>
Luce Line Ridge
>
135 Luce Line Ridge - 31-118-23-34-0007
>
Septic
>
2016-01108 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:31:21 PM
Creation date
6/20/2017 10:53:10 AM
Metadata
Fields
Template:
x Address Old
House Number
135
Street Name
Luce Line
Street Type
Ridge
Address
135 Luce Line Ridge
Document Type
Septic
PIN
3111823340007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. D�STRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersat Media: <br /> B. Enterthe Component: Length: �ft W1dth:��ft Depth;��ft <br /> C. Number of Components per Row= Bed Length divided by Component Length (Round up) <br /> � ft = � ft= �components/raw <br /> D. Actual Bed Length= Number of Components/row X Component Length: <br /> �components X �ft = ��ft <br /> E. Number of Raws=Bed Width divided by Componen#Width(Round up) <br /> � ft s �� ft= Q rows AdJust wfdth so thts 1s an whole number. <br /> F. Totat Number of Components=Number of Components per Row X Number of Rows <br /> � X �� _ �components <br /> 6. MOUND SIZING <br /> A. Catcutate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Clean Sand Lift <br /> 3.0 ft - 2.0 ft = 1.0 ft Design Sand Lift(optionap: ��ft <br /> B. Calcutate Upslope Height: Clean Sand Lift +media deptfi +cover{1 ft.) - Upstope Height <br /> 1.0 ft + i.0 ft + 1.0 ft= 3,0 ft <br /> C. Select Upslope Berm Multiplier(based on land slope): 2.00 <br /> tand Stope% ' 0 1 2 3 4 ` 5 8 7 8 9 1(� 11 12 Lattc <br /> Upslope Berm 3:1 3.U0 2.91 2.83 2.75 2.68 2.61 2.54 2.48 Z.4z 2.36 2.31 2.�6 2.21 Upslop� <br /> Ratio 4c1 4.00 3�$5 3.70 3.57 3.dS 3.33` 3.23 3.12 3.03 2.94 2.$6 2..78 2.70 Ra� <br /> D. Calculate Upstope Berm Width:Muitiptier X Upslape Mound Height =Upstope Berm Width <br /> 2.00 ft X 3.0 ft = G.0 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Slope 1 100=Drop (ft) <br /> 10.0 ft X 15.0 % = 100= 1.50 ft <br /> F. Calculate Downstope Mound Height: Upstope Height+Drop in Elevation =Downslope Height <br /> 3.Q ft + 1.50 ft � 4.5 ft <br /> G. Select Downstope Berm Muttiplier(based on land slope): 5.80 <br /> Land Slope% 0 1 2 3 Q 5 : �i 7 ' 8 9 10 il 12 lanc <br /> Oownslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.45 4.11 4.29 4.48 4.69 Down <br /> Serm Ratio 4:1 4.OQ 4.�,7 :4.35 4.54 4.76 5:OD 5.�6 5:56 5.88 b,25 6:67 7.i4 7.69 eerm <br /> H. Calculate Downstope Berm Width: Multiptier X Downslope Helght =Downslope Berm Width <br /> 5.80 x 4.5 ft = 26.1 ft <br /> I. Calcutate Minimum Berm to Cover Absorption Area: Dawnslope Absot'ptlon Width+4 feet <br /> 10.0 ft +�ft - 14.0 fi <br /> J. Design Downslope Berm=greater of 4H and 41: 26.1 ft <br /> K. Setect Endstope Berm Multiplier: 4.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Mound Height =Endslope Berm Width <br /> 4,00 ft X 4.5 ft = 18.0 ft <br /> M. Calculate Mound Width: Upslope Berm Width + Bed Width +Downstope Berm Width <br /> b.0 ft + 10A ft + 26.1 ft = 42.1 ft <br /> N. Calculate Maund Length: Endslope Berm Width + Bed Length + Endslope Berm W9dth <br /> 18.0 ft + 50.0 ft + 18.0 ft = 86.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.