My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00572 - new septic
Orono
>
Property Files
>
Street Address
>
L
>
Luce Line Ridge
>
115 Luce Line Ridge - 31-118-23-34-0006
>
Septic
>
2010-00572 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:31:16 PM
Creation date
6/19/2017 9:28:39 AM
Metadata
Fields
Template:
x Address Old
House Number
115
Street Name
Luce Line
Street Type
Ridge
Address
115 Luce Line Ridge
Document Type
Septic
PIN
3111823340006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution - <br /> Minnesota^Pollution LTNIVERSITY <br /> Controi Agency Design Worksheet OF MINNESOTA ��; <br /> 1. Select Number of Perforoted Latervls in systemlzone: 3 Geotextile <br /> �������� � Minfmum� � <br /> (2 feet is minimum and 3 feet is maximum spacinq) v. perforations spaced 3'apart� 2•or�x <br /> 2. Select Perforation Spacing: 3.0 ft -- �?�- - <br /> 9'of rock <br /> 3. Select Perforation Diameter Size 7/32 inch Perforatian sizing:'/.'m�i.• <br /> Perforatlon s 'n :2'W 3' <br /> 4. Length of Laterals =Media Bed Length -2 Feet. Perforotion can not be closer then 1 foot from edge. <br /> 63 - 2ft = 61 ft <br /> 5• Determine the Number of Perfor4tion Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft - �ft = 20 Spaces <br /> 6. Number of Perforations per Lateral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Latera( = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check Table 1 to verifjr the number of perforations per latern(guarontees less than a 10%discharge variation. The value is double if <br /> the a center manifold is used. <br /> �• Total Number of Perforotions equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X �Number of Perf. Laterals = 63 Total Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended value is 4-10 ftZ per perforation. �������PM� <br /> Does not appl y to At-Grades Parforatlon Dfamater <br /> Mad(ft) ��� '/u '/n '/� <br /> Bed Are4 = Bed Width(ft)X Bed Length (ft) <br /> 1.0' 0.18 0.41 0.56 0.74 <br /> 10 ft x 63 ft = 625 ftZ +•s o.:2 o.s, 0.69 0.9 <br /> zo" o.zs o.es o.ao �.a <br /> 23 0.29 0.65 0.89 1.17 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of Perforations (Line 7). 3.0 0.�: o.�: o.� ,.� <br /> a.o 0.3� o.ea �.0 �.a� <br /> 625 ftZ .- 63 pertorations c 9.9 ftZ/perforations 15foot 0.41 0.93 P 1.26 7.65 <br /> 1/41'xh ard 3/16 i�h erfontlons on <br /> dwellinqz <br /> 9. Select Minimum Average Head: 1.0 ft ��8 in[h peAo�aHdis on dwellings and for <br /> 2 feet other estaDlishments <br /> 1/4 inth aM 3/16 ifxh pefo2tbr�on M5T5 <br /> 5 feec 1/8 inch perfaratiaa on M5T5 <br /> 10. Select Perforation Dischorge (GPM)based on Table III: 0.56 GPM per Perforation <br /> ��• Determine required Flow Rate by multiplying the Total Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br /> 63 Perforations X 0.56 GPM per Perforation = 36 GPM <br /> 12. Select Type of Manijold Connection (End or Center): ❑end ❑center <br />
The URL can be used to link to this page
Your browser does not support the video tag.