Laserfiche WebLink
:/.' ''IO _�..\ <br /> .!�� � � �•,,,.1 <br /> /�' Q '`\ <br /> �� � �1 CITY of OIZ4N0► <br /> I , r ,6 � II <br /> `��'. � '' � ��,,;' Municipal Offices <br /> �,,',\�,� � �. � � \. G , , <br /> Street Address: Mailing Address: <br /> ��9.kE,$.Kp'4��' 2750 Kelley Parkway P.O, Box 66 <br /> __.��__... Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> To: The Current Owner of Address L� � �- v C'e � �'1-3� `� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other ' <br /> Septic Tank(s ump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> c� -2�{ O � . The tank(s} should be cleaned through the manhole and <br /> not through the inspection pipes,this allows for proper cleaning. <br /> Comments: <br /> �. <br /> Inspector: ��L1 ate of Inspection `l ' �� <br /> Telephone(9�2) 249-4600 � Fax(952) 249-461b <br /> www.ci.orono.mn.us <br />