Laserfiche WebLink
:_:.:;� <br /> � O� <br /> O :: O O <br /> ����-.�_� ��� - CITY of OliON <br /> ;., �._ ,. . <br /> ��,.:..�,.. :,_ <br /> �� �._�.:. <br /> a! ty�'"::���'j'�';,:�� �, Municipal Offices <br /> r Y'% hJ�'.., , <br /> \`� ��+i�r"'"��,�,r,�i��r,�j: ti, <br /> �,.. . � a <br /> \�\'�� j���,;�;�,?*�'`���,�G Street Address: Mailing A ress: <br /> 9 �::r,s�x:`'`''4�,. P.O. Box 66 <br /> ,� �ESx� 2150 Kelley Parkway <br /> Orano, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Cuxrent Owner of Address �3 �S C v�f�i P� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The.onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �_ � <br /> No <br /> If yes,please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> No �— <br /> If yes, system must be brought into compliance by: <br /> December 31,2007 � <br /> December 31,2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s)were last pumped out on <br /> ) t - � -0 3 . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes,this allows for proper cleaning. <br /> Comments: <br /> ����X�G �1��'.i`�,� S ��o . <br /> Inspector: Date of Inspection <br /> Telephone(9�2)249-4600 • Fax(9�2)249-4616 <br />