My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info plus 1990 septic design
Orono
>
Property Files
>
Street Address
>
L
>
Longview Circle
>
2300 Longview Circle - 03-117-23-23-0018
>
Septic
>
Septic info plus 1990 septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:38 PM
Creation date
6/14/2017 12:37:33 PM
Metadata
Fields
Template:
x Address Old
House Number
2300
Street Name
Longview
Street Type
Circle
Address
2300 Longview Cir
Document Type
Septic
PIN
0311723230018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P TESTING, INC. <br /> 851 KATYDID LANE <br /> ST. MICHAEL, MN 55376 <br /> 497-3566 <br /> Steven B. Schirmers . <br /> April 12, 1990 <br /> Don Scott ' <br /> Lot 5, Block 1 ' ,� ,�-���� <br /> Longview� East parcel ' ���.;;,, � <br /> Orono, Henn. Co. , MN � A <br /> fi.'�"�'�:."t!� ����r "2aY <br /> This system is Designed for a Type 1, four bedroom home and in accordance <br /> with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. This Design is for future expansion for the existing <br /> house. � <br /> The soils on this site are typical of SCS soils mapped - LrB - Lester <br /> loam. A seasonally high water table was located at 22" , 24" & 30" , <br /> (mottled soil) . Due to the seasonally high water table, a pressurized <br /> mound system will need to be installed. The bottom of the rock bed <br /> must be located at least 3 ' above the seasonally high water table. . <br /> The soils at a dPpth of 18" have a percolation rate averaging 24.4 <br /> min/inch and are adequate for treating septic effluent. <br /> A pumping chamber will need to be installed to lift the effluent to the <br /> treatment area. <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber. The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over, just .break up the sod, be sure <br /> not to over work. <br /> :,. <br /> The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure. A warning device must be <br /> installed with a light and sound device, this is in case of a pump failure. <br /> (Mercury floats are a good method) . <br /> All neighboring wells are located more than 100 ' away from the proposed <br /> treatment area & 50 ' away �on this site. The City requires a 75 ' setback <br /> .from the well . The existing well will need to be moved at the time <br /> the future expansion area is needed. <br /> Keep all heavy equipment off of the proposed treatment area before and • <br /> after construction as much as possible. The treatment area should be <br /> marked off before construction. , <br /> CONT'D <br /> Soil and Percolation Teitt <br /> Septic Sy�tent Dtaign <br />
The URL can be used to link to this page
Your browser does not support the video tag.