Laserfiche WebLink
I <br />PAVILION 011EroLANO <br />BAR OVEroANGB <br />BELGAAD HOLLAND D TYPE <br />CONCRETE UNIT PAVER, GASCONY <br />TAN COLOR. BET ON r BED OF <br />COIIACMCIA AGGREGATE AND <br />P BAND. PAVER, PATTERN AND <br />BRTMUTIONMETHOD TO MATCH <br />BAITING PAVILION FLOOR <br />DROP ELEVATION VAT <br />MIDDLE OF YRTODHFADER <br />FOR DRAINAGE OF Fi00R. <br />ILY YIO00 HEADER To - <br />CONTAW PAVERS. VERIFY <br />I Yr LONG. BET ON r <br />COMPACTED CLS <br />AGGREGATE. MATCH <br />PAVILION VIDOD. <br />CABINET DOOR, 7 TOTAL. — <br />LOCATION AND SIZE ARE <br />APPROXIMATE. FIELD CUT <br />CONC. FLOCKS TD INSERT. <br />PROPANE Grow. - <br />LOCATION AND ON <br />ARE APPROXIMATE. <br />FIELD CUT COUNTER <br />TOP TO RECEIVE <br />APROXIMATS OUTUNE OF — <br />KITOHENUNIT. ABOVE <br />KITCHEN AREA PAVING LAYOUT <br />NOTES <br />NOOIAAR CONCRETE <br />RETABYNG WALL. <br />STEPTOFOLLOW <br />LMOBC <br />ADJINACENT <br />DGRADE <br />AS INDICATED <br />I. KITCHEN SET TO BE GRANO ISLAND TYPE, <br />4. PLANT 14 BUSH HONEYSUCKLE SHRUBS, B5 <br />PRODUCED BY R004BM CONCRETE <br />POT, AS DIRECTED BY ROIAND ABERG. <br />PRODUCTS, IN 3 SECTIONS (GRAND ISLAND <br />S. STRIP OFF TOPSOIL IN KITCHEN PLAZA AREA <br />BAR W/ STORAGE; 4 FT. BAR SECTION <br />AND STOCKPILE FOR LATER USE TO BUILD UP <br />W/GRILL AND STORAGE AND CORNER <br />GRADES AROUND THE EDGE OF THE PLAZA. <br />RETURN SECTION). <br />6. USE ANY REMAINING TOPSOILAS PLANTING <br />2. SEE HEDBERG KITCHEN PRICE DOCUMENT <br />BACKFILL, OR PURCHASE EXTRA GARDEN SOIL <br />(03/25/16) FOR KITCHEN SET IMAGES AND <br />FOR THAT PURPOSE. <br />FOR KITCHEN SUPPORT SLAB DETAIL (WITH <br />T• DISPOSE OF ANY EXCAVATED SUBSOIL. <br />PIERS AND REBAR). <br />B. PLACE A 3" LAYER OF WOOD BARK MULCH <br />3. A MASONRY SAW WILL BE NEEDED FOR <br />IN SHRUB BEDS AND AROUND ADJACENT <br />INSTALLING STN. STL CABINETS AND GRILL <br />TREES. SHOVEL CUT A 4" DEEP TROUGH ALONG <br />THE OUTSIDE EDGE OF THE SHRUB BED, <br />I <br />� --7, 6 7--� �"P� SAD OF <br />LEVEL W M PAVILION FLOOR <br />SURFACE ELEVATION. <br />KITCHEN UNIT CONCRETE SLAB <br />LOCATION PLAN <br />KEY PLAN (NOT TO SCALE) <br />THE ORONO SCHOOL <br />CLASSROOM PAVILION <br />KITCHEN ADDITION <br />ENTRY <br />M:lTCHEN <br />ADDITION <br />RECEIVED <br />APR 18 2017 <br />CRY OF ORONO <br />ITn. MMI�J�IF <br />ROLAND ABERO <br />NOa7H WKWAPE ARCHITECT L-1 <br />