Laserfiche WebLink
♦ <br /> � � City of Orono <br /> � Zoning Permit Application <br /> Mailing Address: Permit number: p2f��D�� rp <br /> �0� PO Box 66 <br /> 0 � �Q�, Crystal Bay, MN 55323-0066 Date received: �� � d <br /> �';^,,,,_ � <br /> ,� ' 1 �� s, ! Street Address: Escrow amount: <br /> � � ��`'"' <br /> \� � �ti 2750 Kelley Parkway Permit Fee: , � <br /> `�gEs��`'�� Orono, MN 55356 <br /> ---'� Received by: , <br /> Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us d. �- p,��P.� �y�`d• <br /> This application form must be completed in full and all required information must be submitted. (Please print.) <br /> GENERAL INFORMATION: <br /> Job Site Address: /J:�•S� L o„�,/G /o �/�� Ora.�o <br /> CONTRACTOR/APPLICANT INFORM ION: <br /> Name: ��,��a,., �vri,.�Z ,..�;�,.4.-� <br /> Phone: 6>�- �.�� •�t-o�� C�.1f u:n�r �Ca� it Fax: <br /> Address: ypo E /�,r�, ��'� City: �tij,r,/J ZIP:��- yo8 <br /> Contact Person: �"�,,,.��� ContacYs phone number �,�. �.�� -�ra s� <br /> Email �,`�„U,.��,,, � �',�,,,,��2�id'har.Co�PPlicant is: Contractor Homeowner (Circle One) <br /> PROPERTY OWNER INFORMATION: <br /> Name: G'/a. I=�c,�� .�-f� 2�.�,`�; ..✓�.,,�.�.i' <br /> Phone (day): �s/•�,�/•�-6 q� L ��• Soi• yooq <br /> Mailing Address: 3' J' L j�I I n ZIP: S� <br /> Emailand/orFax [GLiI/yD � c.o/- Cow� <br /> Overall Project Description: ��P���� �,��,� � y-;},�„�, S�+c�s a,,,"� �-w v c c�a.�Se-c�t�c�,r�� <br /> �Y Ce��.��«k� o„ -�k�b� ��,...,c. A�c ��,,6�."t�r-r.� s¢r,„�/�i.J. <br /> �/ <br /> ����tr d�c. �c� �l`cu�-y�n_ <br /> Check TYPE OF PERMIT COST <br /> Box <br /> Residential Dock- Permanent dock on any lake or initial seasonal dock not on $30 + engineering review <br /> Lake Minnetonka ermanent dock re uires CUP costs <br /> Commercial Dock $50+ engineering review <br /> costs <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Minor Land Alteration (grading, filling or excavating)-500 or less cubic yards $50+ engineering review <br /> outside of lakeshore setback or less than 10 yards in lakeshore setback costs <br /> Escrow for erosion control and en ineerin review costs $2,000 <br /> Major Land Alteration (grading, filling, or excavating) more 500 cubic yards or $30 <br /> more than 10 cubic yards in lakeshore setback (also requires CUP) <br /> Escrow for erosion control and en ineerin review costs As determined b CUP <br /> Stairway to Lake $50+ engineering review <br /> costs <br /> Escrow for erosion control and engineering review costs—N /.}� . �• $2,000 <br /> Retaining Wall not requiring a building permit (A building permit is required for any $50+ engineering review <br /> retaining wall that measures more than four feet from bottom of footings to top of costs <br /> wall. Tiered retaining walls are considered one wall unless the walls are separated <br /> by twice the height of the lower wall.) <br /> Escrow for erosion control and en ineering review costs $2,500 <br /> Tree Removal or intensive vegetation removal in 0 to 75 foot zone No char e. <br /> Structure Permit for other structures not requiring a building permit but regulated $50+ engineering review <br /> by the zoning code (including, but not limited to accessory building of less than 120 costs <br /> square feet, detached deck or platform and sport court) <br /> Escrow for erosion control and engineering review costs $2,500 <br /> (over) <br />