Laserfiche WebLink
� <br /> . �� • <br /> ����T 03/18/2004 <br /> Adjustments for Base Service Charges Adjustment <br /> Carpenter-Finish;'Trixn/Cabinet 108.80 <br /> Carpenter-General Framer 98.50 <br /> Carpenter-Mechanic 114.84 <br /> Cleaning Technician 48.20 <br /> Floor Cleaning Technician 55.70 <br /> Drywall Installer/Finisher ZZ8 84 <br /> Electrician 114.72 <br /> Hardware Installer 1O8.5U <br /> Heating/A.C.Mechanic 116.38 <br /> Insulation Installer 123.60 <br /> Painter 85.86 <br /> Total Adjustments for Base Service Charges: 1,203.90 <br /> Line Item Totals:031604-00001 31,379.04 0.00 31,379.04 <br /> Grand Total Areas: <br /> 4,102.67 SF Walls 2,489.93 SF Ceiling 6,592.60 SF Walls&Ceiling <br /> 2,340.55 SF Floor 260.06 SY Flooring 640.71 LF Floor Perimeter <br /> 0.00 SF Long Wall 0.00 SF Short Wall 661.63 LF Ceil.Perimeter <br /> 2,275.32 Floor Area 2,486.03 Total Area 4,240.22 Interior Wall Area <br /> 2,075.45 Exterior Wall Area 36133 Exterior Perimeter of <br /> Walls <br /> 0.00 Sw�ace Area 0.00 Number of Squares 0.00 Total Perimeter Length <br /> 0.00 Total Ridge Length 0.00 Total Hip Length 0.00 Area of Face 1 <br /> 031604-00001 Page: 23 <br />