Laserfiche WebLink
fi <br /> MARIE WENDT <br /> 03/18/2004 <br /> CONTIl�(UED-E BR <br /> ; <br /> DESCRIPTION QUANTITY UNIT CO5T RCV <br /> The above line item will be handled by the flooring contractor <br /> Room Totals: E BR 588.60 <br /> � <br /> �-sr- ��-� Room:Stairl <br /> �r <br /> c 1 0.00 <br /> „�,0�-1 0.00 <br /> 0.00 O.OQ <br /> 0.00 0.00 <br /> 0.00 <br /> DESCRIPTION QUANTITY UNTT COST RCV <br /> - Clean and deodorize building-Hot thermal fog 608.75 CF 0.04 24.35 <br /> Clean the walls and ceiling 151.97 SF 0.18 27.35 <br /> Seal then paint the walls and ceiling(2 coats) 151.97 SF 0.52 79.02 <br /> Clean door(per side) 2.00 EA 3.72 7.44 <br /> Stain&finish door slab only(per side) 2.00 EA If necessary <br /> Clean stair stringer-per side 24.00 LF 0.45 10.80 <br /> Clean stair tread-per side 14.00 EA 0.83 11.62 <br /> Ciean stair riser-per side 13.00 EA 0.83 10.79 <br /> Room Totals: Stairl 17137 <br /> Area.Totals: Main Level <br /> 2,530.64 SF Walls 772.19 SF Ceiling 3,302.83 SF Walls 8c Ceiling <br /> 801.43 SF Floor 89.05 SY Flooring 330.04 LF Floor Perimeter <br /> 031604-00001 Page: l6 <br />