Laserfiche WebLink
, � <br /> MARIE WENDT <br /> 03/18/2004 <br /> CONTINUED-W BR <br /> DESCRIPTION � QUANTITY UNIT COST RCV <br /> Sand and seal wood floor 137.50 SF Ifnecessary <br /> The above line item will be handled by the flooring contractor <br /> Room Totals:W BR � 662.29 <br /> '-'•s'-� Room:WALK-IN <br /> P 4,�. <br /> iV <br /> .+,�,,,,,�,,,�, �, ° 18133 SF Walls 27.92 SF Ceiling <br /> T i � `° 209.26 SF Walls&Ceiling 27.92 SF Floor <br /> � �,�.� 3.10 SY Flooring 22.67 LF Floor Perimeter <br /> , 22.67 I.F Ceil.Perimeter <br /> _ �s P <br /> ur� <br /> DESCRII'TION QUANTITY UNIT COST RCV <br /> Clean and deodorize building-Hot thermal fog 223.39 CF 0.04 8.94 <br /> Cleaa the walls and ceiling 209.26 SF 0.18 37.67 <br /> Clean light fixture 1.00 EA 5.35 5.35 <br /> Seal then paint t6e walls and ceiling(2 coats) 20926 SF 0.52 108.81 <br /> Clean door(per side) � 2.00 EA 3.72 7.44 <br /> Stain&finish door slab only(per side) 2.00 EA If necessary <br /> Clean door/window opening(per side) 2.00 EA 6.54 13.08 <br /> Stain&finish door/window trim&jamb(per side) 2.00 EA If necessary <br /> Clean shelving-wood 11.00 LF 0.47 5.17 <br /> Clean baseboard 22.67 LF 0.18 4.08 <br /> 03160400001 Page: 9 <br />