Laserfiche WebLink
.���� <br /> ;�O O <br /> � _ - <br /> ���, , �r� ,.,- CITY o� ORONO <br /> � � � <br /> \, a , . , , _, <br /> ' =E � lC� Municipal Oft3ces <br /> '\� ! ��' ' r�,�.� ,y' <br /> � ' ' �'�� ' �� G Street Addross: MailinQ Address: <br /> ��' ��"i�,�;.,�°, . <br /> '�EggOg'� 2750 Keliey Pa�kway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> February 18, 2000 <br /> Troy& Catherine Anderson <br /> 1490 Long Lake Boulevard <br /> Long Lake, Mn 55356 <br /> Dear Mr. & Mrs. Anderson: <br /> The above described property is in a Metropolitan Urban Service Area (MUSA) for sanitary <br /> sewer installation. The factors for initiating the sewer project were smaller lot sizes and non- <br /> compliant septic systems with limited replacement sites available. The septic system serving <br /> your home is a compliant system according to State and City standards. Your property was <br /> exempted from connecting to the sanitary sewer system at that time. <br /> The existing septic system serving your home may stay in use until the system becomes non- <br /> compliant. If for any reason the septic system becomes non-compliant, the home must then <br /> connect to the sanitary sewer system If the home undergo's a remodeling project that will <br /> increases the total water use, the home must then connect to the sanitary sewer system. <br /> Minor maintenance can and should still be conducted on your septic system. Pumping the septic <br /> tanks, repairing or replacing pumps, and replacement of septic tank bat�les are examples of <br /> acceptable repairs. If the septic system needs major maintenance, such as septic tank <br /> replacement or drainfield replacement, connection to the sanitary sewer system will be required. <br /> If there are any questions regarding this letter, please contact me at (612) 249-4600. <br /> ectfull , <br /> , -�� <br /> ris Pence <br /> On-Site Systems Manager <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />