Laserfiche WebLink
r <br /> . instailation Options for Deck Lateral Load Connections �; <br /> (house wall treming —24� <br /> notshown) es�'Typ.SpaCirp D1T1Z—750-Pound Assembly(Cont.) <br /> 3' 1'Typ. 1 Y4' <br /> Conditlon 3–Wali Plate is <br /> �.; <br /> �o� Below Bottom of Deck Joist <br /> , �� � Fxtension <br /> ���a,�.� The DTT1 Z has been tested <br /> � �--� � with the blocking assembly <br /> ` -" - � � shawn in Figures 5A and 5B, <br /> ��, � which allows the holdown to <br /> shown far cla' �y��i�,� be loarered up to 3�/'below <br /> "ri� the bottom of the deck joist <br /> of D1T1ZAnchor <br /> 6-Stronq-Drhre°SDWS TIMBER Fipure 5A Figure 58 �n order to anchor into the <br /> Screws(Model No.SD1NS23000D6) (aide vlew) (end view) center of a wall plate. <br /> 2x8�Q4'Biackinp for F�ctensions up to 1�4' <br /> Dc70x24'BlacMnp for Extensions up to 3�/' <br /> Condition 4–Wall Stud Recaiving <br /> Mshor poes Nat Align with Dedc Joist <br /> '��`�� �` ��� �� °� ; � �� The DTT1Z may be positioned on <br /> ' � '—Dec1c�` horizontai 2x8 blocking that can be <br /> '�,.� . 's � installed between two deck joists,as <br /> shown in Figures 6A and 66.This <br /> t �� � 2-Shonp-Drive°SDWSTIMBER allows the hoidown to be centered on a <br /> ornz �,,,� Screwa(Model No.SDWS22400D8) wall stud that does not align with a deck <br /> 4.�� iMo each joist joist.Alternatively,an additional deck <br /> Each Side �g�� <br /> c�me�orr,z�,w�e sn,a joist can be added to the deck to align <br /> Figure 6A Fipu�e 88 �,�„$,,,,,,,;,��a 5,,,,„,fo��;y,� with a wail stud(not shown). <br /> (side view) (end view) <br /> (House wal��mnbq <br /> �atshown) <br /> omz Condition 5–Joist Hanper Flanges <br /> � ._,o o �, �' o � IMerFere wiih Serew Anchor <br /> r In some cases it may be necessary to <br /> �, t� � position the DTT1Z in a location that <br /> Q 1 conflicts with a joist hanger or other <br /> � 3�s'Typ. OStroiq-Ddve�SOWSTIMBER obstruction.Figures 7A and 7B detail an <br /> o s���rio.sowszz�aooe� assembly that ailows the DTT1 Z to be <br /> � ���0��r► ?x4x1T Blockinp installed 1�i°away from the face of the <br /> = Figure 7A Fipure 7B deck joist. <br /> a (side riew) (end view) <br /> E <br /> 0 <br /> U <br /> O <br /> � zw•Mm.a�cno� <br /> o �— �EmbedmeM <br /> 0 3iY Min.to •.e .: ' <br /> E top of concrele � °� �' � Condition 6–Ledper Attaehes to Concrete Foundation Wail <br /> �, '°' '��„ �•.•.• As an atternative to using a Strong-Drive�SDWH Timber-Hex HDG <br /> � ''a. =° - screw or fully threaded�b'lag screw,the DTT1Z may be anchored with <br /> � a�e'mechanically galvanized Wedge-Ali�anchor(as shown in Figure 8) <br /> �,xr,,�,�,,,,,,�,9,�,,,,,,�,,, :•:.',•'. to achieve the 750-pound load requirement. <br /> YYedpe-AIMAnchor . <br /> t�aeiw�nooMc� . <br /> Figure 8 <br /> Condition 7– Floor Joist Framing is Perpendicular to the Deck Joist(Not Shown) <br /> The IRC states that the 750-pound holdown detail is"applicable where the floor joists are parailel to deck joists." <br /> For fioor joists perpendicular to deck joists,refer to Conditfon 2 for the OTT2–1,500-Pound Assembly on the next page. <br />