My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MCWD
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
540 Big Island - PID: 22-117-23-42-0001
>
Land Use
>
MCWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:12:17 PM
Creation date
6/6/2017 8:46:04 AM
Metadata
Fields
Template:
x Address Old
House Number
540
Street Name
Big Island
Address
540 Big Island
Document Type
Land Use
PIN
2211723420001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/._; ANDERSON <br /> � � ENGINEERING Summary of Experience: <br /> Kristina Justen, an Environmental Associate, brings a range of knowledge and <br /> KRISTINA A. JUSTEN experience in the environmental field to the Anderson Engineering team. Priorto <br /> her employment with Anderson Engineering of MN, LLC, Kristina worked as a <br /> Environmental Associate technician for the Minnesota Pollution Control Agency. The skills Kristina has <br /> developed through her educational background and experience as a technician <br /> make her proficient in assessing and addressing a range of environmental <br /> Education: issues, and clearly communicating solutions to clients and various regulatory <br /> BS Biology(2010) agencies. <br /> University of Wisconsin-River Falls <br /> Kristina's project experience includes natural resource inventory, watershed <br /> assessments, biologic assessments, Threatened and Endangered Species <br /> Specialized Training: analysis, NEPA project management and environmental review document <br /> Certified in Stream Electrofishing preparation, wetland determinations, delineations, mitigation design and <br /> WI DNR,April 2010 monitoring, regulatory permit applications, wetland functions and values <br /> assessments, flood plain analysis, ordinary high water determinations, <br /> Environmental Compliance Audit activities,wetland macroinvertebrate sampling, <br /> Professional Associations: Floristic Quality Assessments, Total Maximum Daily Load (TMDL) investiyation, <br /> MN Wetland Professionals Association and aerial photo interpretation. Kristina has experience with Global Positioning <br /> Systems(GPS), remote sensing, and Geographic Information Systems(GIS). <br /> Total Experience: Representative Projects: <br /> 6 years <br /> • Southwest Light Rail Transit- Metropolitan Council—Minneapolis, MN: <br /> Services for wetland delineation and permitting efforts in support of multi- <br /> Years with Current Firm: disciplinary consultant team for preparation of Final Environmental Impact <br /> 2010 to Present Statement for proposed 16 mile light rail alignment. Project tasks included <br /> completion of a wetland field investigations, boundary delineations,functional <br /> assessments, GPS mapping and preparation of federal, state and local <br /> wetland permits. <br /> • Wetland Delineation/Assessment — Fort Mc Coy Alderwood Dam <br /> Removal—Fort McCoy,WI: Services included a wetland determination and <br /> delineation of wetland associated with a proposed dam removal project at the <br /> Fort McCoy U.S. Army installation. Project tasks included completion of a <br /> wetland delineation following the 1987 USACE Wetland Manual and the <br /> Midwest Regional Supplement and preparation of the wetland delineation <br /> report to document findings and help assess potential wetland impacts for <br /> Section 401/404 permitting. <br /> • NEPA DocumentationlWetland Permitting—Omaha National Cemetery— <br /> Omaha, NE: Services included preparation of an Environmental Assessment <br /> (EA)and Finding of No Significant Impact(FONSI), and supplemental permit <br /> coordination with the Omaha District U.S.Army Corps of Engineers(USACE) <br /> for proposed wetland impacts. Wetland permitting activities included <br /> completion of a wetland boundary delineation in compliance with the 1987 <br /> USACE Wetland Manual and Midwest Regional Supplement,and preparation <br /> of a USACE permit application package that included a design for an on-site <br /> compensatory wetland mitigation area. <br /> • Wetland Delineation, Permitting, and Compliance Activities — Various <br /> Locations: Services include completing the following general tasks in <br /> compliance with federal, state, and local regulations: performing routine <br /> wetland determination and delineations to identify regulated aquatic <br /> resources; preparing wetland permit applications that outline impact <br /> sequencing and replacemenUmitigation requirements; providing technical <br /> assistance to clients to develop and implement corrective actions to address <br /> compliance violations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.