Laserfiche WebLink
, <br /> � ` 1���,� �c� �� <br /> THIS SYSTEM IS DEStGNED FbR <br /> ��— ����sP�1�r� I36o y�'�� .,�BEDROOMS. ANY 1NCREASE IN NUMBER <br /> OF BEDROOMS iNVALIDATES TNlS DESIGN. <br /> �� � �� <br /> L� � ��� <br /> Joseph 41san D.B.A. <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J.Olson--1�IPCA License#81Q <br /> 11-�51 Ri��ervieH� Rd.tiE, Hano��er,;V1?`' ��341 <br /> (763) -l98-8779 Fa� (7b3)�t98-8290 <br /> Januar� ?3.?01? <br /> Gom�ea Homes <br /> -173U Au�usta Street <br /> Orono. Hennepin County <br /> This un-site Se«a�e Treatment S}stem is designed for a l���pe (,fi�e-bedruom I�ome in accordance�cith <br /> the�4tinnesota Pollution Control.4gency Chapter 7080 and local ordinances. <br /> The periodical{� saturated suils�rere located at I2-16 inches(mottled soil). Due to the periodicall� <br /> saturated soils.a pressurized mound s�stem«•ith 6 inches of rock�vilt need to be ittstailed to treat the septic <br /> etiluent.The bottom of the treatment area must be located at least 3'abo��e the saturated soits.This s��stem <br /> is designed N ith 6 inehes of roek. <br /> The soiis at a depth of 1?"haye a percolation rate averagim, 13.1 iv1Pi. <br /> A 2�>0-aall�n septic tank is designed for this site. All tanl�s need to be insulated if there is less than t�+o <br /> fert of cover c�►er the top uf the tanks.Clean vuts must tx installed on the end uf the laterals for <br /> maintenance. <br /> Usr 7 32 inch perforations on the laterals. <br /> A Dan�in 1300�allon pumpin�chamber K ill need to be installed to lift the effluent to the treatment area. <br /> I he po�+er suppl��and switches must be located outside the manhale and pumping chamber in a <br /> ��eatherprooi endosure.A�carning de�ice must be installed��•ith light and sound devices:this is in case of <br /> a pump failure.A filo«�mzasurement de�ice must be installed.lncluding but not limited to a water meter, <br /> e�-ent counter,runnin��time ctocks or elecrronicalh controlled dosin�. <br /> Keen all heavv eauiament off of the proposed treatment areas before,durin¢and after construction. <br /> The area around both sites must be fenced oft br the contractor before an��construction be¢ins. <br /> W'ith proper installation and maintznanc�.this s}�stem should hace no problem in treatin�septic et�luent <br /> et�zcti�el�.Nothins other than gra} ��ater,(laundn.showers,etc.►Human�sater and toilet tissuz should be <br /> dispQsed uf into the septic tanks.Garbas;e disposals are not recommended.Additives must not be used they <br /> ma� cause ham�ful dama��e to vour sep�ic s�stem. It is recommended that�ou pump the septic tanks ever�� <br /> t«o�ears. <br /> �sinc rei�. CITY OF ORONO <br /> --''��- i ' SEPTIC PE IT PL EVIEW <br /> loseph J.Ol�n INSPECTOR <br /> D.A�.TE .� � PERMIT NO. Z6�(7���/ <br /> 36�.!' nh�kovr:n ns s�1i3�t[TTF:D <br /> /[� APPROVf:D tiVITH CORRECTIONS AS NOTF,D <br /> [] NOT APPROVED-CORRF.CT&RF.SI:BM(T <br /> Thcse comments are for your infbrmatic�n. All work shall be done <br /> in fidl compliance with ull upplicuble septic And zoning code. <br /> kequircments including items nut spccil'ically noted in Ihis review. <br /> KI:LP'CHIS PLAN SE"C Oh SITE AT ALL TfMGS <br />