Laserfiche WebLink
. <br /> , � � r��t��,e'.���a,�' :,� �� �' . � _...-- b - �- -- �'c...�.i►'2 <br /> Ross Langhans _ <br /> From: arlen.grant@comcast.net <br /> Sent: Tuesday, April 17, 2012 8:01 PM <br /> To: Ross Langhans <br /> Subject: Re: Orono Project <br /> Attachments: image001.png <br /> Ross, <br /> Typically a basic procedure is included in the structural notes on removal and reinforcement projects <br /> like the Loma Linda Lane job. <br /> I was reviewing the options, and am considering recommending the following sequence: 1) the <br /> removal of the loose 'fall hazard' material from the bottom of the block slab 2) the installation of the <br /> concrete formwork from the bottom of the block slab including plywood and construction <br /> grade dimensional lumber shoring 3) removal of the material strip from the top of the slab 4) setting <br /> rebar and 5) casting concrete and finishing using the formwork installed prior to material removal. <br /> This would be a bit slower than 'dropping' the material, however it would remove shoring during <br /> demolition and allow a more controlled demolition process. <br /> Note that the patching of the miscellaneous small areas would be done from the bottom of the slab. <br /> Is this procedure acceptable to you? <br /> Kind regards, <br /> Arne <br /> From: "Ross Langhans" <ross@structuresunlimitedonline.com> <br /> To: "arlen grant" <arlen.grant�comcast.net> <br /> Cc: mburns@visi.com <br /> Sent: Friday, April 13, 2012 7:12:40 AM <br /> Subject: RE: Orono Project <br /> Arne, <br /> Same here± <br /> Job address is 1180 Loma Linda Lane, Orono. See you at 10 am Saturday. <br /> ROSS A. LANGHANS,OWNER <br /> STRUCTURES UNLIMITED, INC. <br /> www.structuresunlimitedonline.com <br /> cell#61�-384-4663 <br /> ��,�,��,��t�at ��n�rat e�rr� <br /> �����7�1��� <br /> i��������l,t��r:. <br /> �.�.��.� <br /> 1 <br />