My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00750 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
L
>
Loma Linda Avenue
>
1180 Loma Linda Avenue - 08-117-23-23-0002
>
Permits/Inspections
>
2012-00750 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:42:26 PM
Creation date
6/5/2017 1:08:44 PM
Metadata
Fields
Template:
x Address Old
House Number
1180
Street Name
Loma Linda
Street Type
Avenue
Address
1180 Loma Linda Ave
Document Type
Permits/Inspections
PIN
0811723230002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> , � � r��t��,e'.���a,�' :,� �� �' . � _...-- b - �- -- �'c...�.i►'2 <br /> Ross Langhans _ <br /> From: arlen.grant@comcast.net <br /> Sent: Tuesday, April 17, 2012 8:01 PM <br /> To: Ross Langhans <br /> Subject: Re: Orono Project <br /> Attachments: image001.png <br /> Ross, <br /> Typically a basic procedure is included in the structural notes on removal and reinforcement projects <br /> like the Loma Linda Lane job. <br /> I was reviewing the options, and am considering recommending the following sequence: 1) the <br /> removal of the loose 'fall hazard' material from the bottom of the block slab 2) the installation of the <br /> concrete formwork from the bottom of the block slab including plywood and construction <br /> grade dimensional lumber shoring 3) removal of the material strip from the top of the slab 4) setting <br /> rebar and 5) casting concrete and finishing using the formwork installed prior to material removal. <br /> This would be a bit slower than 'dropping' the material, however it would remove shoring during <br /> demolition and allow a more controlled demolition process. <br /> Note that the patching of the miscellaneous small areas would be done from the bottom of the slab. <br /> Is this procedure acceptable to you? <br /> Kind regards, <br /> Arne <br /> From: "Ross Langhans" <ross@structuresunlimitedonline.com> <br /> To: "arlen grant" <arlen.grant�comcast.net> <br /> Cc: mburns@visi.com <br /> Sent: Friday, April 13, 2012 7:12:40 AM <br /> Subject: RE: Orono Project <br /> Arne, <br /> Same here± <br /> Job address is 1180 Loma Linda Lane, Orono. See you at 10 am Saturday. <br /> ROSS A. LANGHANS,OWNER <br /> STRUCTURES UNLIMITED, INC. <br /> www.structuresunlimitedonline.com <br /> cell#61�-384-4663 <br /> ��,�,��,��t�at ��n�rat e�rr� <br /> �����7�1��� <br /> i��������l,t��r:. <br /> �.�.��.� <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.