Laserfiche WebLink
, <br /> . <br /> ❑ SAC Charge(2011 Rate=$2,230.00) $ <br /> (SAC Charge must accompany all sewer pemut applicarions unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> �Sewer Connection is /Repair($50.00/Per Stub) $ <br /> Pipe size in •-material Schd 40 air tested; cast iron <br /> ❑Water Connection/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> ❑Water Availability For Future Hook-Up to Water($50.00) $ <br /> Water Availabilitv Explanation: <br /> Contractor installed line to inside of house for fuhue hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connecrion Permit is Issued: <br /> 1. Issue Water Meter&Horn Pernut <br /> 2. Any Additional Connecrion Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Pernut Fee&Issue Water Connection Permit <br /> l. SUBTOTAL of Permit Requested: $ <br /> ,� <br /> 2. STATE SURCHARGE $ 5.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ <br /> _�� � � ����������;` .��,����: � ���� <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a separatepermit. <br /> ■ WATER METERS must be set and sealed by Orono W$ter Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are,true and correct. <br /> � <br /> Applicant: Date: �—�" /� <br /> C���°� C <br /> �� �� � � <br />