Laserfiche WebLink
PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: ��.__� � Y v�+GL� ��� Permit No.: ��7� Q�(����0 <br /> Description of work: Date Rec'd: <br /> Septic review by: Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: y Date Approved: l <br /> Grading review by: Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC � Width: Lot Coverage: SF % <br /> Survey Submitted: � Yes � N Date of Survey: Revised date � : <br /> Landscape plan submitted? �Yes No Landscaper: <br /> Proposed Setbacks: <br /> Front(Lake) Rear(Street) ( N S E W ) ( S E W ) Other Buildings Wetland <br /> S e Side <br /> Defined Height: Peak Height: E: FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet)= 50° = L.F. below grade <br /> Basement? � Yes � No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPA : FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance betwe the lowest roposed Slab at or above grade— <br /> START W ITH floor(of the basem nt or crawl sp ce)and measure from highest existina <br /> the highest point the roof. prade to the highest point of the <br /> START WITH roof even if fill was brought in to <br /> elevate home. <br /> If you have a.. <br /> SUBTRACTION • GAB OR HIPPED ROOF(n Slab below grade—measure <br /> (BASED ON wind ws): Subtract half the dis nce from highest existing grade to the <br /> ROOF TYPE) be een the highest point of the roof hi hest int of the roof. <br /> to he low point of the corcespon ing If you have a... <br /> ble or hipped roof SUBTRACTION ' �`B�E OR HIPPED ROOF <br /> • GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> windows): Subtract half the distan ROOF TYPE) the distance between the <br /> between the top of the highest highest point of the roof to <br /> window and the highest point of the the low point of the <br /> roof corcesponding gable or <br /> hipped roof <br /> ALL OTHER ROOF TYPES(flat, . GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance behveen <br /> (BASED ON basemenUcrawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the window and the highest <br /> GRADES) foundation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />