Laserfiche WebLink
♦ - - <br /> a � <br /> 300 Big Island WENCK <br /> Septic System Design � <br /> . <br /> Responsive partner. <br /> Exceptional outcomes. <br /> • Final Treatment - Effluent is fiitered through an effluent filter and pumped to a <br /> gravity fed drain field. As the effluent trickles down into the soil biochemical <br /> processes remove harmful viruses and bacteria. <br /> 6. Description of Treatment System - See Figure 1 and design sheets in Appendix C for <br /> additional detail. Contractor can select equivalent products to those described below if <br /> they meet the requirements of local ordinance, MN Rules Chapter 7080, designer <br /> approval, and owner approval. <br /> • Septic Tank - Proposed: 1,000 gallon Infiltrator� IM-1060 septic tank. Inlet and <br /> outlet of the tanks must have rubber fittings to create watertight seals. <br /> Contractor to follow manufacturer installation and burial requirements. <br /> • Lift Tank - Proposed: 1,000 gallon Infiltrator� IM-1060 septic tank. Inlet and <br /> outlet of the tanks must have rubber fittings to create watertight seals. <br /> Contractor to follow manufacturer installation and burial requirements. Tank to <br /> include an effluent pump to deliver a minimum of 20 gallons per minute with a 10 <br /> foot head. Use 2-inch Schedule 40 PVC for supply pipe from pump to the first <br /> drop box. <br /> • Septic/Lift Tank Risers - 24" diameter heavy corrugated PVC pipe. A watertight <br /> seal must be created between top of tank and the each riser using a tank to riser <br /> adapter and sealing the riser to the adapter with appropriate waterproofing <br /> agents. Top of riser should be 1" - 3" above finished grade. <br /> • Septic/Lift Tank Riser Cover - 24" diameter fiberglass cover with gasket and <br /> minimum 2" of insulation. Do not bury riser cover. <br /> • Drain Field - Excavate the drain field at the location depicted on Figure 1 and as <br /> staked on site. Contractor can vary location slightly based on field conditions to <br /> install trenches on contour. Install trenches shallow with a maximum depth of 24 <br /> inches. Each trench is 28 feet long (seven chamber units in each trench). Install <br /> five trenches as shown on Figure 1. Total trench length is 140 feet, or 35 <br /> chambers. <br /> • Install 35 Infiltrator�Quick4 High Capacity gravelless chambers at a maximum <br /> depth of 24 inches. Effluent will be distributed through drop boxes. Install the <br /> chambers as recommended by the manufacturer. Cover the gravelless chambers <br /> with 12-18 inches of cover and slope away. Establish a vegetative cover over the <br /> drain field immediately. <br /> 7. Limitations - Our investigation, layout, design, and recommendations are based on data <br /> submitted. If conditions considerably different from those described in this report are <br /> encountered, we must be notified. If proposed construction or components are <br /> changed, we must be notified to evaluate the effect of the changes on the wastewater <br /> system. Any changes to the design must be approved by the designer and will be <br /> assessed additional design costs. If changes are made to the design without the <br /> knowledge and approval of the designer the design shall be void. All construction is to <br /> 2 <br /> N:\Technical\2005\07\2017\300 Bio Island Design Report.dotx <br />