Laserfiche WebLink
JOB# 2005-01 <br /> � � � . <br /> Measurement No. 1 Conducted By Peter Miller <br /> Location TP- 1 Date 11/6/2007 <br /> Weather Condition Cloudy Temperature 40's <br /> Horizon AB <br /> Hole Depth 33 cm Measured (Actual)water level in hole <br /> Distance between reference level Initial 15 cm <br /> and soil surface + 1 cm Final 15 cm <br /> Distance from the hole bottom to Radius of the hole ( r) 2.65 cm <br /> the reference level (D) = 34 cm <br /> Desired water depth in hole (H) - 15 cm <br /> Constant-head tube setting (d) = 19 cm <br /> Reservoir Used for Measurement of the Steady-State Flow Rate <br /> Flow Measuring Reservoir Only Conversion Factor(C.F.) =20cm2 <br /> Both Flow Measuring and Main Reservoirs X Conversion Factor(C.F.) = 105cm2 <br /> (To obtain flow volume multiply change in water level by the appropriate C.F. from above.) <br /> Reservoir in a er <br /> Clock Time Reading �t Level Flow Volume Q Q Kset <br /> h:min cm min �m cm3 cm3lmin cm3/hr cm/h <br /> 224 37.7 <br /> 226 37 2 0.7 73.5 37 2205 2.49 <br /> 228 36.5 2 0.5 52.5 26 1575 1.78 <br /> 230 35.9 2 0.6 63 32 1890 2.13 <br /> 235 35.2 5 0.7 73.5 15 882 1.00 <br /> 240 34.5 5 0.7 73.5 15 882 1.00 <br /> 245 33.8 5 0.7 73.5 15 882 1.00 <br /> Average of Last three measurements: Ksat= 1.00 cm/h 5.86 9Pd/ft <br /> z <br /> COMMENTS: <br />