Laserfiche WebLink
MINUTES OF THE REGULAR ORONO COUNCIL MEETING HELD JUNE 24, 1985. PAGE 3 <br /> #913 PAUL PHILLIPS Councilmember T. Adams noted that the final resolution <br /> (CONT. ) should place the developer/owner on notice that the drainage <br /> tile will be the owner ' s responsibility to maintain and not <br /> the City' s responsibility. <br /> Mayor Butler questioned the wording on the survey regarding ' <br /> the 100 year high water mark at 1005 . 5 unless drain tile is not <br /> plugged. <br /> Surveyor, Mark Gronberg, clarified for the Council the <br /> meaning of such wording. Gronberg stated that the <br /> calculations were done for. the 100 year storm assuming that <br /> the tile would be plugged. Gronberg stated that the <br /> calculations show what the worst case would be. <br /> Councilmember T. Adams asked Phillips if he has any <br /> preliminary plans for the property shown on the survey north <br /> of the proposal. <br /> Paul Phillips presented sketches of his proposal for the <br /> property to the north. <br /> Mayor Butler moved, Councilmember Frahm seconded, to <br /> recommend approval of the preliminary plat application of <br /> Paul Phillips finding all standards of the on-site septic <br /> code and the rural standards of the RR-1B zoning district <br /> have been satisfied based on the following findings : <br /> l. If Lot 1 is to be approved as a buildable site the <br /> following conditions and controls must be placed on the <br /> future use of the property: <br /> A) Septic area of Lot 1 must be safeguarded for future use <br /> as there may not be another suitable septic area within <br /> the boundaries of the lot. At the time the septic system <br /> is installed a berm must also be installed along the west <br /> side of both the primary and alternate test sites and <br /> east of proposed road or if road is constructed first, <br /> developer must stake off septic area prior to <br /> construction and provide information in road plans as to <br /> how drainage will be carred away from septic area. <br /> B) First habitable level of residence structure to be at <br /> 1007 . 5 elevation. <br /> C) All changes in elevations or grades on Lot l , outside <br /> of original building permit review, must be approved by <br /> the City. <br /> 2. Drainage tile running through Lots l , 2 and 3 must be <br /> designated as 15 feet drainage easement. <br /> 3 . Conservation and Flcwage Easement to be taken over <br /> drainage easement--engineer todetermine prior tofinal <br /> plat approval if additional area around tile inlet <br /> should be incluced within drainage easement . <br />