My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P04753 - gas fireplace
Orono
>
Property Files
>
Street Address
>
L
>
Livingston Court
>
3733 Livingston Court - 17-117-23-34-0074
>
Permits/Inspections
>
2001-P04753 - gas fireplace
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:38:37 PM
Creation date
5/24/2017 9:59:14 AM
Metadata
Fields
Template:
x Address Old
House Number
3733
Street Name
Livingston
Street Type
Court
Address
3733 Livingston Court
Document Type
Permits/Inspections
PIN
1711723340074
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ <br /> CITY OF ORONO APPLICATIOV FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAI,INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by retum mail after a review is completed. PERMITS ARE NOT VALID UNTIL <br /> YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON <br /> THE JOB SITE. <br /> 3. Mechanical Desiens - Complete calculations, details and specifications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioning installation inciuding heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. V4'tien any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. <br /> 6. All work must be inspected(rough-in and final). Ca11249�600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. - <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600: <br /> Please check one: �New Addition Repair Replace <br /> �. Residential Commercial <br /> JOB SITE: ���'� L'.jG�C,�'�'rJr /i�j�C r Zip: <br /> Owner's Name: �'�¢�.,�� ��,�i Telephone lti'umber: <br /> Mailing Address: � City: Zip: <br /> Contractor's Name• _ � s s � Telephone Number: <br /> Mailing Address:�3�D� l�T � � Cit3':/��tr'�v:� ZiP:S�Z��/ <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make: <br /> ModeL• <br /> Fuel: <br /> Flue Size: <br /> Input BTUs: <br /> Output BTUs: <br /> CFM: _ <br /> COOLING SYSTEMS � <br /> Quantity: <br /> Make: <br /> Model: <br /> Tons: <br /> H. Power <br />
The URL can be used to link to this page
Your browser does not support the video tag.