My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00362 - new townhome
Orono
>
Property Files
>
Street Address
>
B
>
Bridgewater Drive
>
799 Bridgewater Drive - PID: 33-118-23-12-0022
>
Permits/Inspections
>
2017-00362 - new townhome
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:03 PM
Creation date
5/24/2017 8:38:58 AM
Metadata
Fields
Template:
x Address Old
House Number
799
Street Name
Bridgewater
Street Type
Drive
Address
799 Bridgewater Drive
Document Type
Permits/Inspections
PIN
3311823120022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, Fees to be Char ed YES NO � <br /> Permit <br /> Plan Review <br /> State Surcharge (/ <br /> Investigation Fee <br /> SAC—Number of SAC Units <br /> Other(specify) t�-' <br /> S uare Foota e $ er S uare Foota e <br /> Basement X = $ <br /> 1� Floor X = $ <br /> 2nd Floo� X = $ <br /> Garage X = � <br /> Fl �.,�� <br /> Estimated Construction Value: $ ���i��(;'/� <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing a Site �Plumbing 0 Grading/Filling <br /> ' Poured Wall Silt Fence/Erosion Control Mechanical � Fire <br /> �Foundation Survey � Hardcover Removal �Fireplace �Water Connection <br /> 0 Framing 0 Other(specify) � Masonry �Sewer Connection <br /> �Waterproofing/Drain tile �Mfg. 0 Lawn Irrigation <br /> � Foundation Waterproofing 0 '�ther(specify) � Landscaping <br /> �Framing <br /> �Insulation <br /> As-Built Survey <br /> Final <br /> Lathe Required State Permits <br /> � Other(specify) <br /> � Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> �e Builder Acknowledgement Form <br /> 0 Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: October 2016 <br /> v:\forms�plan review checklist 10-2016.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.