My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00362 - new townhome
Orono
>
Property Files
>
Street Address
>
B
>
Bridgewater Drive
>
799 Bridgewater Drive - PID: 33-118-23-12-0022
>
Permits/Inspections
>
2017-00362 - new townhome
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:03 PM
Creation date
5/24/2017 8:38:58 AM
Metadata
Fields
Template:
x Address Old
House Number
799
Street Name
Bridgewater
Street Type
Drive
Address
799 Bridgewater Drive
Document Type
Permits/Inspections
PIN
3311823120022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
View images
View plain text
To:Christine Mattson<CMattson@ci.orono.mn.us> <br /> Sub�ect: RE:797&799 Bridgewater Drive/#2017-00361&2017-00362 <br /> Chris, <br /> 1've reviewed the subject Grading Plans and offer the following comments: <br /> 1. The grading plan should be updated to show the proposed Sediment/erosion control plan. <br /> 2. The plan depicts proposed retaining walls but does not call out the top and bottom of wall elevations in <br /> accordance with the city survey standards. Based on the nearest proposed spot elevations it appears that <br /> some of the wall will exceed 4 ft in height. Walls 4'or greater in height must be designed by a licensed <br /> professional, and plans must be submitted to the City for review prior to the approval of the permit.Tiered walls <br /> are considered one wall unless they are separated by at least twice the height of the lower wall. <br /> 3. One of the walls is depicted on the property line. Walls over 2 feet must be set back 5 feet from the property <br /> line. <br /> 4. A separate utility permits will be required for the sewer and water connections. <br /> Adam <br /> From:Christine Mattson <br /> Sent: Monday,April 17,201710:10 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject:797&799 Bridgewater Drive/#2017-00361&2017-00362 <br /> Adam, <br /> We received building permit applications for two new townhomes. Please review and provide comments. Thank you! <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway 0 Orono I MN O 55356(physica/addressJ <br /> PO Box 66 I Crystal Bay I MN � 55323-0066(mailinq addressJ <br /> "�" 952.249.4620 I 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us I � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> PLEASE NOTE: Summer Office Hours start Monday,May 22,2017 <br /> Monday-Thursday: 7:30 am to 5 pm/Friday 7:30 to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday, May 29,2017(Memorial DayJ <br /> z <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).